Log in to see the plans as drawn To improve the environmental health of the Noosa River Estuary through active restoration
Project Goal and conservation activities that engage the Noosa Community in meaningful conservation
and support economic and community wellbeing.
Expected
Party
completion date
responsible
Objectives Deliverables (from 1 July 2019 Measurable outcomes
for
unless otherwise
Deliverable
stated)
Provide Minimum 5 peer review
technical and reports completed during
expert support the three year term of this
to Noosa for *(A5.2) Provide Agreement, if requested by
planning, technical/peer review on NSC. If NSC requests a peer
Ongoing for
implementation minimum five review, TNC will provide a
duration of TNC
and evaluation plans/reports/studies if minimum of 3 experts who
project
associated with requested by Noosa are qualified in the relevant
appropriate Council. area of expertise for NSC
elements of the consideration and Noosa
Noosa River Plan Council’s acceptance of one
and other expert for the peer review.
coastal and *(A5.3) Facilitate a
marine minimum of three study
management tours of relevant sites in line
plans with objectives and scope of
Minimum three individuals
the program in Australia/US
on study tours completed
if requested by Noosa 36 months
during the three year term TNC & NSC
Council (flights and
of this Agreement, if
incidentals covered
requested by Noosa Council.
separately by Noosa
Council, accommodation
and in-country travel
covered by this Grant).
*(A5.4) Develop a
Conservation Action Plan
for specific issues (not yet
Conservation Action Plan
determined) relevant to the 36 months
and Community Workshops TNC & NSC
Noosa Estuary (including
completed as required.
community workshops) if
requested by Noosa
Council.1
*(A5.5) Facilitate access to A number of new
TNC conservation networks Ongoing for contacts/networks to assist
and researchers if duration of Noosa Council with ongoing TNC
requested by Noosa project and future marine
Council. conservation activities.
1
Note, deliverable changed to Coda Fellowship on commercial fishing (see Chapter 7). An additional deliverable for
seagrass restoration (A5.8) has also been added (see Chapter 7).
15
BRING BACK THE FISH: PROJECT MANAGEMENT PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.