Skip to the record
Accept no substitutions.

Original source · versioned page text

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                Knowledge into project planning, ranger
                                                                                                                programs).
                                                                                                           3.   Establish process for regular engagement with
                                                                                                                Traditional Owners, based on their preferred
                                                                                                                method.
                                                                                                           4.   Consider appropriate remuneration for
                                                                                                                consultation.
                                                                                                           5.   Consider Welcome to Country, Indigenous
                                                                                                                names for new shellfish restoration sites and
                                                                                                                support for cultural ceremonies/practices.
                       Poor performances of      Threat or danger to the good name or             MEDIUM   1.   Undertake due diligence on all third-party           LOW
                       TNC or partners           standing of a business or entity as the result                 subcontractors and avoid working with those
                       negatively impacts        of the actions by a project partner, due to                    with compromising or non-aligned values.
                       project                   the actions of an employee, or through                    2.   Listen and consider opinions of stakeholders on
                                                 other peripheral parties and                                   subcontractors and an individual’s reputation.
                                                 subcontractors.                                           3.   Request all project partners understand and
                                                                                                                honor TNC’s Code of Conduct and Values and
                                                                                                                include clauses in third party contracts.
                                                                                                           4.   Suspected concerns to be mitigated through
                                                                                                                prompt damage control measures such as direct
                                                                                                                communications with relevant individuals or
                                                                                                                businesses and terminating working
                                                                                                                relationships early.
                                                                                                           5.   Prepare key messages for any media response as
                                                                                                                part of an agreed communications protocols
                                                                                                                with project partners.
Environmental          Rock oysters, and         Oyster recruitment, growth and survival is       MEDIUM   6.   Use science and habitat suitability models to        LOW
                       associate species, fail   lower than anticipated and fails to meet                       inform the site selection process (e.g. water
                       to grow and               restoration benchmarks. Alternate, rocky-                      quality, topography, hydrodynamic, sediment
                       consolidate and           reef or sediment habitats form or persist                      analysis, benthic habitat type, historic shellfish
                       function like a           instead of shellfish ecosystem resulting in                    ecosystem locations)
                       shellfish ecosystem       lower biodiversity and environmental value.               7.   Establish TAG review process and provide
                                                                                                                opportunities for stakeholder workshops to peer
                                                                                                                review the data and process,
                                                                                                           8.   Consult with key experts and relevant
                                                                                                                authorities and draw upon experience gained
                                                                                                                from other projects and processes.
                                                                                                           9.   Develop full ecological risk assessment for
                                                                                                                shellfish restoration.


                                                                                                                   42
         BRING BACK THE FISH: PROJECT MANAGEMENT PLAN
Log in to download the original file

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.