PLANNING & ENVIRONMENT COMMITTEE MEETING MINUTES 12 JULY 2022
Stormwater Drainage
29. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and the Queensland Urban Drainage Manual, and must include in
particular:
a. 7kL of storage for roofwater capture and reuse. The storage tank is to receive
only roofwater runoff and is to be provided with a solid lid to prevent the inflow of
surface runoff. A backflow prevention device is to be fitted to restrict the backflow
of water in the detention tank into the roofwater storage;
b. Captured roofwater is to be plumbed to communal non-potable fixtures, including
bin washdown and landscape irrigation;
c. Stormwater pits receiving surface runoff are to be provided with litter-baskets;
and
d. An underground detention tank is to be provided within the site to ensure site
discharges achieve non-worsening for the range of durations relevant to the
downstream drainage network.
30. In conjunction with the development application for Operational Works, revised
detention tank design calculations and documentation is to be provided which identifies
all assumptions and the methodology applied in deriving the tank design, and which is
based on the recommendations of Australian Rainfall and Runoff 2019 and QUDM
2017. Ensemble temporal patterns are to be utilised for the analysis as well as the
current rainfall intensities recommended by Bureau of Meteorology. The detention tank
is to achieve non-worsening for the range of durations and recurrence intervals relevant
to the downstream drainage network.
Condition 30 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Services
31. Reticulated electricity and telecommunication services must be provided to the
development in accordance with the standards and requirements of the relevant
service provider.
32. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
33. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater) which certifies that the development has met the requirements
of this Decision Notice and all applicable legislation at the time of construction.
Easements
34. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
35. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
endorsement.
36. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Page 10 of 12