Council archive · source document
Att 3b - Stormwater · 132003.221172.8
Attached to the e-mail Change to DA (23657 DA Duplex Dwelling) - 132003.221172.8 Attachements 132003.221172.7 - 61 Elanda St.msg.
aqua The site is located on a beach dune. Although the geotechnical information provided by Global Testing Pty Ltd (refer Attachment 2) did not provide an infiltration rate for the saturated hydraulic conductivity of the in-situ sands, previous work in the area and empirical values for soils in this area indicate a saturated hydraulic conductivity at the site were likely to be a minimum of k=2.56 x 10° m/s (9216 mm/hr). All calculations within this document are based on this value. No information as to the depth to groundwater was available and it is assumed that the base of infiltration trenches can be located at least 1.0 m above the seasonal high water table. The methodology for the design of infiltration trenches is contained within “The WSUD Technical Design Guidelines for South East Queensland” was adopted for this project. Chapter 7 of these Guidelines outlines two alternate methodologies for the sizing of trenches being; the Hydrological Effectiveness Method and the Design Storm Method. Calculation by both methods was undertaken for comparison. The Hydrological Effectiveness Method aims to size an infiltration trench such that a specified proportion of the mean annual runoff volume will infiltrate into the soil profile. The guidelines provide a series of design curves based on an idealised tank/trench layout for estimation of trench size. Based on the geotechnical information provided and an assumed trench of 0.9 m deep and 0.8m wide (porosity = 0.95 being an Atlantis Flo-Tank). This assumes a system that the double tank system and 2 cells wide. Figure 7-7 of the Guidelines indicates that a trench with an area equal to 1.5% of the catchment area would achieve a hydrological effectiveness of 100%. That is, an infiltration trench with an area of 1.5% of the catchment and 1 m deep would infiltrate 100% of the mean annual runoff from the site. The alternate method for infiltration tank sizing is the Design Storm Method. As determined above the design objective is to capture and infiltrate up to a 1% AEP (1 in 100 year ARI design event) runoff volume. This method sizes a required detention volume based on the following: - the volume of runoff from the catchment during the design event; - the saturated hydraulic conductivity of the in-situ soil/sand; and - the dimensions of the proposed trench including the length, width and height of the trench. The required detention volume is the difference between the volume of runoff from the catchment and the volume that can be infiltrated during a rainfall event. From the hydrologic model outlined above the volume of runoff from the proposed lots was calculated (using the WBNM model output) for the 1% AEP event. Table 3 shows the calculated infiltration requirements and the number Atlantis Flo-Tank (double) to cater for these infiltration requirements. Detailed calculations are provided in Attachment 3. Table 3: Required Infiltration — Atlantis Flo-Tank (Double — 2 cells wide) Volume Based on | Volume Based on Required WBNM Sub- Area (ha) Hydrological Design Event Rai onc No of Atlantis Catchment Effectiveness Method (m’) 2 Flo-Tank (Double) Method (m?) (vd) np Site (excluding area draining to 0.0416 6.24 5.77 6.42 25 road) m: 0439 119 890 t: +7 5414 7185 e: [email protected] Ww: www.aquaintel.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 3b - Stormwater.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.