Minor Change Existing Approval 51988.2770.02

of 9

Page text shows just the words. Original shows the document exactly as it was published.

               33.    A waste management plan, in accordance with the requirements of Planning Scheme Policy
                      PSP9 Waste Management, is to be provided to Council for approval prior to the issue of the
                      development permit for building works.
               34.    Unless specifically conditioned otherwise, all works must comply with the relevant acceptable
                      solutions as contained in the Waste Management Code and Water Quality and Drainage
                      Code of the Noosa Plan.
               35.    Adequate area must be provided on-site for the collection and separate storage of recyclable,
                      non-recyclable, vegetative and hazardous materials in their specific waste streams during
                      removal or demolition works.
               36.    All waste materials must be removed from the site to avoid causing unhealthy conditions,
                      with the site left clean, tidy and free from any debris.
               37.    Where a development permit has not been issued for the future use of the site, hard surfaced
                      areas including concrete slabs must be removed and disturbed areas must be revegetated
                      in accordance with PSP2 Landscaping of the Noosa Plan 2020. Alternatively, the site must
                      be turfed within 20 business days of completing the removal or demolition work.
               38.    Erosion and sediment control is to be undertaken in accordance with the requirements of the
                      Water Quality and Drainage Code of the Noosa Plan. Measures are to be installed and/or
                      maintained until soils are stabilised by vegetation or sealed.
                      NOTE: It is an offence under the Environmental Protection Act 1994 to deposit or potentially
                      allow litter, waste, soil, or other contaminants to enter a waterway or storm water drainage
                      system (e.g. roadside gutter).
               5.     REFERRAL AGENCIES

               Not Applicable
               6.     ADVISORY NOTES

                      Building and Construction Industry (Portable Long Service Leave) Levy
               1.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Demolition
               2.     All building materials containing asbestos products are wrapped and disposed of in
                      accordance with the Public Health Regulation 2018 and the Environmental Protection
                      Regulation 2019.
                      NOTE: Asbestos is a Regulated Waste. The Department of Environment & Science licenses
                      businesses that transport asbestos waste, and landfills that accept this waste.
               3.     Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
                      requires a licensed asbestos removalist to give notice to Workplace Health and Safety
                      Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
                      commences. Notification must be made using Form 65: Notification of licensed asbestos
                      removal work, demolition work or emergency demolition.
               4.     The ‘Plumbing and Drainage Regulation 2019’ states that at demolition or removal of a
                      building requires the existing sanitary drain upstream from the connection point for a service
                      provider’s sewerage system must be sealed water tight. This work is deemed as Notifiable
                      Work and must be carried out by a suitably licenced plumber who shall submit an As
                      Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
                      Construction Commission) within 10 days of completing the work.




                                                                                                        Page 6 of 9
Document Set ID: 23255088
Version: 4, Version Date: 23/09/2024
Log in to download the original file

Minor Change Existing Approval 51988.2770.02.pdf · 163 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.