6.4 Temporary and Permanent Retention
Excavations are expected to range up to around 5 m BGL (existing ground levels) and, given that the
planned excavations extend close to some of the site boundaries and underground infrastructure (e.g.
stormwater to north-west), some form of temporary excavation shoring will likely be required.
Based upon our experience with similar sites, we anticipate that temporary shoring may be achieved by
use of sheet piles, however Unitywater and NC requirements for existing infrastructure, and the
sensitivity of neighbouring structures, may restrict the use of sheet piles. Shoring of deeper cuts would
likely require lateral restraint, and this is conventionally achieved by helical steel anchors (similar to screw
piles) in sands. However, the proximity to neighbouring properties would likely require permissions to
be obtained for subterranean access. Therefore, where lateral support by cantilever only is not feasible, it
is suggested that internal struts/propping be considered to provide lateral restraint for the shoring
system.
Sheet piles may require pre-drilling to loosen sands to the design foundations levels to prevent adverse
vibrations during sheet pile installation. Ground vibration monitoring and management would also be
necessary.
Other shoring methods that could be considered include bored contiguous or secant piles, micropiles or
CFA piles. Non-contiguous or soldier pile walls are not feasible for the proposed development due to
the likelihood that the sands would ‘flow’ through gaps between the piles before application of structural
facing.
An advantage of contiguous or secant pile wall retention systems is that they are ultimately used for the
permanent walls, whereas sheet piles would be temporary to provide retention during construction only,
therefore requiring a permanent structural wall to be constructed. Bored pile walls generally require
greater width (horizontally) for installation as compared to sheet piles and are often more expensive.
The advice of a specialist shoring contractor must be sought regarding feasibility, design and installation
of the proposed retention and associated subsurface drainage system. It will be necessary to conduct
numerical analysis to optimise the retention system. Detailed design will also need to account for
relevant factors of safety to maintain the temporary and long-term stability of the retention system.
Retaining structures greater than 1 m high, or those required to support surcharge loads or sloping
backfill, will require engineer design and certification of construction. Retaining wall design should be
carried out in accordance with AS4678-2002 Earth retaining structures.
Design for temporary and permanent retaining structures could be carried out using a pressure
distribution applicable to the wall type (e.g. trapezoidal for propped or anchored walls) and based on the
parameters listed in Table 4 overleaf. These values do not include allowance for hydrostatic pressures
nor transient (e.g. construction) or adjacent footing loadings.
Geotechnical Investigation
30 January 2026 | 25408-001-Rev0 15
Document Set ID: 25158026
24528612
Version: 1,
2, Version Date: 10/09/2026
13/02/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Reference Document - MCU26 0001 & OPW26 0002 - AS PUBLISHEDRelated documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.