Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
° Problems, remedial actions undertaken and the outcomes of those actions; ° Incidents, accidents and complaints. The Superintendent shall supply Council’s Environmental Officer with copies of any environmental monitoring data, reports, documents etc within 48 hours of written request. Environmental Audit Reports shall be submitted to Council within seven (7) days of finalisation by the Environmental Auditor. 1.6.3 Access & Inspections - Construction The following persons will be permitted to inspect any part of the site or works at any time in the company of the Superintendent (or representative): ¢ Council’s nominated Environmental Officer (or representative); and e Environmental Auditor. 1.7 DESIGN AND CONSTRUCTION PLANNING Extensive environmental investigation and planning for the Attunga Heights development has been undertaken to ensure compliance with the development conditions. These previous studies have informed this EMP. Other information used in preparation of this EMP includes: e Site-specific investigations; e Experience in EMP performance; and e Preliminary construction and sequencing plans for the Attunga Heights project (see Construction and Sequencing Plan prepared by Qantec McWilliam Pty Ltd.). 1.8 TRAINING AND AWARENESS Prior to commencing work on site all project staff and subcontractors shall undertake a site-specific environmental induction. The induction includes the following: ¢ Environmental values of the site in context of adjacent and nearby sensitive areas; e Environmental risks associated with construction and access; ¢ Compliance with relevant statutory obligations including but not limited to “Environmental Duty of Care” and “Duty to Report”; ¢ Identification of environmental documentation and content of the EMP including requirements for compliance with; e Level of environmental commitment expected; and e Environmental reporting requirements for environmental matters and incidents (potential and actual). Where training is identified for specific EMP elements, and/or for environmental issues, contro] measures and equipment, the Superintendent shall arrange training for relevant staff contractors. Preliminary EMP: Attunga Heights Issue: 1 ‘|i4 Chenoweth EPLA Revision: 0 12/12/2007 |
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.