OP Works - Attachment 5 - 6 Quamby Pl

Attached to the e-mail Proposed Operational Works (Beach Replenishment) OPW19/0238 - 6 Quamby Place Noosa Heads.

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

construction of the works; or                            directed at maintaining the water quality of tidal water;               condition.
(b) disturbance to the sediment on the bed and banks of (b) if a relevant planning scheme standard is more stringent than
the tidal water; or                                      the standard mentioned in paragraph (a)—the relevant planning
(c) exposure to acid sulphate soils.                     scheme standard, to the extent it is more stringent than the
                                                         standard mentioned in paragraph (a)
12.7 Prescribed tidal works are designed and constructed The design and construction of the prescribed tidal works is            Complies
in a way to ensure they are safe for persons using the   consistent with the following standards—                                An environmental authority for ERA 16 Extractive
works.                                                   (a) subject to paragraph (d), each Australian Standard relevant to and Screening Activities is currently in place
                                                         the design or construction of structures, the materials that should     and held by the operator who will be engaged
                                                         be used, or the measures that should be taken to treat materials        to undertake the beach replenishments works
                                                         used, for structures, to the extent the requirements stated in the      (Attachment 5).
                                                         Standard are directed at ensuring any surface of prescribed tidal       The proposed operational works are for beach
                                                         works on which a person may stand or walk is— (i) not slippery; and replenishment only. This practice of beach
                                                         (ii) does not have any feature that may cause the person to trip or replenishment has been undertaken on-site for
                                                         fall;                                                                   the past 20 years.
                                                         (b) subject to paragraph (d), any part of prescribed tidal works that
                                                         is unsafe for persons using the works is surrounded by adequate
                                                         barriers to deter persons from entering the part;
                                                         (c) subject to paragraph (d), each Australian Standard relevant to
                                                         the design or construction of structures, to the extent the
                                                         requirements stated in the Standard are directed at ensuring
                                                         prescribed tidal works provide safety ladders or other design
                                                         features for the safety of a person who falls off the works into
                                                         water;
                                                         (d) if a relevant planning scheme standard is more stringent than
                                                         the standard mentioned in paragraph (a), (b) or (c)—the relevant
                                                         planning scheme standard, to the extent it is more stringent than
                                                         the standard mentioned in paragraph (a), (b) or (c).
12.8 Appropriate measures are taken for prescribed tidal The design and construction of the prescribed tidal works is            Not Applicable
works for a non-private purpose to ensure an             consistent with the following standards—                                The proposed operational works are to permit
unsupportable live load is not applied to the works by   (a) subject to paragraph (b), prescribed tidal works have erected or the replenishment of the beach back to its

RG Strategic                                                                                                                  PO Box 1818      07 5430 6659
                                                                                                                              Noosa Heads      [email protected]
                                                                                                                              QLD 4567         rgstrategic.com.au
Log in to download the original file

OP Works - Attachment 5 - 6 Quamby Pl.pdf · 381 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.