construction of the works; or directed at maintaining the water quality of tidal water; condition.
(b) disturbance to the sediment on the bed and banks of (b) if a relevant planning scheme standard is more stringent than
the tidal water; or the standard mentioned in paragraph (a)—the relevant planning
(c) exposure to acid sulphate soils. scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a)
12.7 Prescribed tidal works are designed and constructed The design and construction of the prescribed tidal works is Complies
in a way to ensure they are safe for persons using the consistent with the following standards— An environmental authority for ERA 16 Extractive
works. (a) subject to paragraph (d), each Australian Standard relevant to and Screening Activities is currently in place
the design or construction of structures, the materials that should and held by the operator who will be engaged
be used, or the measures that should be taken to treat materials to undertake the beach replenishments works
used, for structures, to the extent the requirements stated in the (Attachment 5).
Standard are directed at ensuring any surface of prescribed tidal The proposed operational works are for beach
works on which a person may stand or walk is— (i) not slippery; and replenishment only. This practice of beach
(ii) does not have any feature that may cause the person to trip or replenishment has been undertaken on-site for
fall; the past 20 years.
(b) subject to paragraph (d), any part of prescribed tidal works that
is unsafe for persons using the works is surrounded by adequate
barriers to deter persons from entering the part;
(c) subject to paragraph (d), each Australian Standard relevant to
the design or construction of structures, to the extent the
requirements stated in the Standard are directed at ensuring
prescribed tidal works provide safety ladders or other design
features for the safety of a person who falls off the works into
water;
(d) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a), (b) or (c)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a), (b) or (c).
12.8 Appropriate measures are taken for prescribed tidal The design and construction of the prescribed tidal works is Not Applicable
works for a non-private purpose to ensure an consistent with the following standards— The proposed operational works are to permit
unsupportable live load is not applied to the works by (a) subject to paragraph (b), prescribed tidal works have erected or the replenishment of the beach back to its
RG Strategic PO Box 1818 07 5430 6659
Noosa Heads [email protected]
QLD 4567 rgstrategic.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original