OP Works - Attachment 5 - 6 Quamby Pl

Attached to the e-mail Proposed Operational Works (Beach Replenishment) OPW19/0238 - 6 Quamby Place Noosa Heads.

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                the sediment on the bed and banks of tidal water;                      previous condition.
                                                                (b) if a relevant planning scheme standard is more stringent than
                                                                the standard mentioned in paragraph (a)—the relevant planning
                                                                scheme standard, to the extent it is more stringent than the
                                                                standard mentioned in paragraph (a).
12.4 Prescribed tidal works are designed and constructed The design and construction of the prescribed tidal works is                  Complies
using materials suitable for marine environments, having consistent with the following standards—                                      The source material used in the beach
regard to their ability to resist the following—                (a) subject to paragraph (b), each Australian Standard relevant to replenishment is to be source adjacent to the
(a) attack by marine organisms;                                 the materials that should be used, or the measures that should be site (State land) as depicted in Attachment 6
(b) corrosion;                                                  taken to treat materials used, for structures, to the extent the       Locational Plan.
(c) deterioration or breakage resulting from exposure to requirements stated in the Standard apply to structures located in
environmental conditions including, for example, the            a marine environment;
following— (i) abrasion; (ii) immersion in seawater; (iii)      (b) if a relevant planning scheme standard is more stringent than
wave action.                                                    the standard mentioned in paragraph (a)—the relevant planning
                                                                scheme standard, to the extent it is more stringent than the
                                                                standard mentioned in paragraph (a).
12.5 Prescribed tidal works are designed and constructed The design and construction of the prescribed tidal works is                  Complies
in a way to ensure they do not adversely affect the             consistent with the following standards—                               The proposed operational works will not impact
operation or maintenance of any existing stormwater             (a) subject to paragraph (c), vessels moored at prescribed tidal       upon the existing stormwater infrastructures.
outlet.                                                         works do not impede the discharge of stormwater;
                                                                (b) subject to paragraph (c), prescribed tidal works do not restrict
                                                                access to any stormwater outlet;
                                                                (c) if a relevant planning scheme standard is more stringent than
                                                                the standard mentioned in paragraph (a) or (b)—the relevant
                                                                planning scheme standard, to the extent it is more stringent than
                                                                the standard mentioned in paragraph (a) or (b).
12.6 Prescribed tidal works are designed and constructed The design and construction of the prescribed tidal works is                  Complies
in a way to ensure they do not adversely affect the water consistent with the following standards—                                     The proposed works will not adversely impact
quality of tidal water, including, in particular, as a result   (a) subject to paragraph (b), each Australian Standard relevant to upon the condition of the Noosa River. The
of—                                                             the design or construction of structures under, within or over tidal   beach replenishment will be limited to
(a) release, into the tidal water, of materials used in the     water, to the extent the requirements stated in the Standard are       replenishing the beach to its previous

RG Strategic                                                                                                                       PO Box 1818       07 5430 6659
                                                                                                                                   Noosa Heads       [email protected]
                                                                                                                                   QLD 4567          rgstrategic.com.au
Log in to download the original file

OP Works - Attachment 5 - 6 Quamby Pl.pdf · 381 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.