OP Works - Attachment 5 - 6 Quamby Pl
Attached to the e-mail Proposed Operational Works (Beach Replenishment) OPW19/0238 - 6 Quamby Place Noosa Heads.
the sediment on the bed and banks of tidal water; previous condition.
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
12.4 Prescribed tidal works are designed and constructed The design and construction of the prescribed tidal works is Complies
using materials suitable for marine environments, having consistent with the following standards— The source material used in the beach
regard to their ability to resist the following— (a) subject to paragraph (b), each Australian Standard relevant to replenishment is to be source adjacent to the
(a) attack by marine organisms; the materials that should be used, or the measures that should be site (State land) as depicted in Attachment 6
(b) corrosion; taken to treat materials used, for structures, to the extent the Locational Plan.
(c) deterioration or breakage resulting from exposure to requirements stated in the Standard apply to structures located in
environmental conditions including, for example, the a marine environment;
following— (i) abrasion; (ii) immersion in seawater; (iii) (b) if a relevant planning scheme standard is more stringent than
wave action. the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
12.5 Prescribed tidal works are designed and constructed The design and construction of the prescribed tidal works is Complies
in a way to ensure they do not adversely affect the consistent with the following standards— The proposed operational works will not impact
operation or maintenance of any existing stormwater (a) subject to paragraph (c), vessels moored at prescribed tidal upon the existing stormwater infrastructures.
outlet. works do not impede the discharge of stormwater;
(b) subject to paragraph (c), prescribed tidal works do not restrict
access to any stormwater outlet;
(c) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a) or (b)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a) or (b).
12.6 Prescribed tidal works are designed and constructed The design and construction of the prescribed tidal works is Complies
in a way to ensure they do not adversely affect the water consistent with the following standards— The proposed works will not adversely impact
quality of tidal water, including, in particular, as a result (a) subject to paragraph (b), each Australian Standard relevant to upon the condition of the Noosa River. The
of— the design or construction of structures under, within or over tidal beach replenishment will be limited to
(a) release, into the tidal water, of materials used in the water, to the extent the requirements stated in the Standard are replenishing the beach to its previous
RG Strategic PO Box 1818 07 5430 6659
Noosa Heads [email protected]
QLD 4567 rgstrategic.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original