                                                           S10.2 The ramp is constructed at a uniform grade and no steeper          Not Applicable
                                                           than 1 in 5 (20%);                                                       A boat ramp is not proposed.
                                                           AND
                                                           S10.3 The outer end of the ramp is no more than 100mm above the Not Applicable
                                                           level of the beach;                                                      A boat ramp is not proposed.
                                                           AND
                                                           S10.4 No part of the ramp is to extend closer than 1m to the             Not Applicable
                                                           prolongation of the boundaries. (Refer Figure 14-33)                     A boat ramp is not proposed.
                                                           AND
                                                           S10.5 The boat ramp surface profile shall be concave to allow            Not Applicable
                                                           concentration of water to the centre of the ramp.                        A boat ramp is not proposed.




Coastal Protection and Management Regulation 2017 - Schedule 3 Code for assessable development that is prescribed tidal works


                Performance outcome                                              Acceptable outcome                                            Applicant’s Response

Character and amenity (generally)—prescribed tidal works not in a canal
2.1 Prescribed tidal works not in a canal are compatible   The design and construction of the prescribed tidal works is             Complies
with their location, having regard to the following—       consistent with the following standards—                                 The proposed beach replenishment works have
(a) the character and amenity of the works’ immediate      (a) subject to paragraph (d), prescribed tidal works do not extend been undertaken on-site for the past 20 years.
surroundings and the locality within which the works are past the side boundary or extended side boundary of the lot                No additional area will be created, and the
located;                                                   connected to the works;                                                  dredged material will replenish the beach to its
(b) if the relevant planning scheme states the desired     (b) subject to paragraph (d), prescribed tidal works are the only        previous condition.
character or amenity for the works’ immediate              works of their type along the edge of the tidal water fronting the
surroundings or the locality within which the works are    lot connected to the works;                                              No alteration to the existing jetty is proposed.
located—the stated desired character or amenity            (c) subject to paragraph (d)— (i) for prescribed tidal works for a
                                                           private purpose—the works are not roofed; or (ii) for prescribed tidal
                                                           works for a non-private purpose—the works are not roofed unless
                                                           they are the main access to land;
RG Strategic                                                                                                                    PO Box 1818       07 5430 6659
                                                                                                                                Noosa Heads       [email protected]
                                                                                                                                QLD 4567          rgstrategic.com.au
Log in to download the original file

OP Works - Attachment 5 - 6 Quamby Pl.pdf · 381 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.