OP Works - Attachment 5 - 6 Quamby Pl
Attached to the e-mail Proposed Operational Works (Beach Replenishment) OPW19/0238 - 6 Quamby Place Noosa Heads.
(d) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a), (b) or (c)—the relevant
planning scheme standard, to the extent it is more stringent than
the standard mentioned in paragraph (a), (b) or (c);
(e) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a) to (d).
Character and amenity (height, scale and size)
3.1 Prescribed tidal works are of a height, scale and size The height, scale and size of the prescribed tidal works is Complies
to ensure the works are compatible with the character consistent with each relevant planning scheme standard. The proposed beach replenishment work has
and amenity of their location, having regard to the been assessed against the relevant local
following— planning scheme (above).
(a) the height, scale and size of the natural features of No additional area will be created, and the
the works’ immediate surroundings and the locality within dredged material is to replenish the beach to
which the works are located; its previous condition.
(b) the height, scale and size of the existing buildings or The proposed works will not impact upon the
other structures in the works’ immediate surroundings amenity of the adjoining land uses.
and the locality within which the works are located;
(c) if the relevant planning scheme states the desired
height, scale or size of buildings or other structures in the
works’ immediate surroundings or the locality within
which the works are located—the stated desired height,
scale or size.
Earthwork, vegetation and rehabilitation
7.1 Excavation and filling for prescribed tidal works— The earthwork and filling for the prescribed tidal works is consistent Complies
(a) is carried out only to the extent reasonably necessary with each relevant planning scheme standard. Dredging will occur adjacent to the site. The
for the works; and approximate location of the source material
(b) does not have a significant adverse effect on— (i) the and its destination have been identified in
natural features, including the banks, of the tidal water in Attachment 6 – Location Diagram.
the works’ immediate surroundings; or (ii) the level of the An environmental authority for ERA 16 Extractive
surface of the land under the tidal water in the works’ and Screening Activities is currently in place
immediate surroundings or any foreshore near the works. and held by the operator who will be engaged
RG Strategic PO Box 1818 07 5430 6659
Noosa Heads [email protected]
QLD 4567 rgstrategic.com.au