Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
3. Working in a Client’s Workplace
Adjust this section to suit your project and the client requirements for the below – all left intentionally blank to incorporate the project specific requirements where they exist.
Hazard Proposed Controls Responsible Person
Risk
Risk
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
HOC
Residual
3.1 Refurbishment works in a live environment
Add project specific requirements associated with the isolation and impairment of client’s fire protection systems during
construction
Striking live services (gas, HIGH 5 Identification of service isolation points prior to commencement of works and communicated to the project. Site Management
electrical etc.) Live service isolation points to be identified and communicated. Contract Partner’s
Task specific controls to be established in the relevant SWMS
Coordination of site works HIGH 5 Emergency Preparedness and Response Plan to be collated to address: Project Manager
with other contractors, client Site Manager
• Access and egress
contractors or the clients’
operations. • Evacuation processes
• Communication protocols
Failure to understand project HIGH 5 Consultation will be undertaken with the client with the objective of identifying specific hazards and issues relating to the Project Manager
hazards project which the client is aware of. Site Manager
3.2Use of client safety systems
Controls required ** information requested prior to commencement on site // clients permit systems to be established prior
to commencement on site // our permit clients permit to isolate.
Client required induction processes.
e.g. communications and time restrictions on noisy work requirements
Incorrect use of client MEDIUM 5 • Implementation of client systems requirements on the project include: Site Management
required systems
• Inductions
• Specific site rules
• Emergency procedures
• Additional personal protective equipment
• Client Permits to work process will be implemented as agreed the requirements for use communicated to all personnel
and complied with (as applicable).
Project Hazard/Risk Assessment / Page 15 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.