Council archive · source document
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Hazard Proposed Controls Responsible Person
Risk
Risk
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
HOC
Residual
• Fire Impairment Notices
3.3Stakeholder required exclusion zones
Control required: e.g. rail corridor – 10m from outside of track etc. CASA flight restrictions
3.4 Access
e.g. Shared access requirements / Restricted access/delivery times
Slips, trips, falls HIGH 4 Public areas will be kept clear of any debris, trip or slip hazards and protected from any projectiles, dust etc. that may be Project Manager
released as a product of work undertaken. Site Manager
Project Hazard/Risk Assessment / Page 16 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.