Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 80

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                                 Proposed Controls




                                                 Risk
                                                                                                                                                                                          Risk




                                                              HOC
      Aspect                    Risk                                                                                                                                                               Responsible Person




                                                Initial
                                                Rating
                                                                                      (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)




                                                                                                                                                                                        Residual
                        Non-compliance with       N/A         5     Identify if any part of the works involves aspects which are heritage listed. (Researching of cultural               N/A       Project Management
☒ Cultural / Heritage   DA conditions                               and/or heritage items should be conducted a tender stage). Ensure all necessary approvals and/or
considerations (DA                             Nil on site.
                                                                    permits are in place before any construction work begins.
requirements)

                        Incorrect storage of      HIGH         3    Sewerage generated from site to be connected to sewer or sewer tank.                                                   M       Site Management
☑ Land                  liquid waste                                Sewer tank to be disposed of by licenced contractor.                                                                           HSE Advisor with
Contamination
                                                                                                                                                                                                   BSBWHS414 OHS Cert
                                                                                                                                                                                                   4
                                                                                                                                                                                                   Contract Partner

                        Injury / damage to        HIGH         3    Injured native Fauna shell be taken to the nearest native animal hospital / refuge. A specialist animal                M       Site Management
☑ Habitats              flora / fauna                               handling group such as WIRES should be called if difficult to handle or dangerous animals are                                  HSE Advisor with
(Protected Flora /                                                  encountered.                                                                                                                   BSBWHS414 OHS Cert
Fauna)
                                                                                                                                                                                                   4

                                                  HIGH         3    Workers to be instructed not to disturb or injure any native Fauna which may be present onsite                         M       Site Management
                                                                                                                                                                                                   HSE Advisor with
                                                                                                                                                                                                   BSBWHS414 OHS Cert
                                                                                                                                                                                                   4
                                                                                                                                                                                                   Contract Partner

                                                  HIGH         3    Minimise removal of vegetation                                                                                          L      Site Management
                                                                                                                                                                                                   HSE Advisor with
                                                                                                                                                                                                   BSBWHS414 OHS Cert
                                                                                                                                                                                                   4
                                                                                                                                                                                                   Contract Partner

                                                  HIGH         3    Vehicles and equipment where there is a risk of pest infestation should be cleared prior to                            M       Site Management
                                                                    entering/exiting site.                                                                                                         HSE Advisor with
                                                                                                                                                                                                   BSBWHS414 OHS Cert
                                                                                                                                                                                                   4

                                                  HIGH         3    Re-instate the work area to its previous condition including the laying of turf or grass seeding as                     L      Site Management
                                                                    required.                                                                                                                      HSE Advisor with
                                                                                                                                                                                                   BSBWHS414 OHS Cert
                                                                                                                                                                                                   4

Review / Monitoring                               HIGH         5    Safety Interactions, Task Observations, Weekly HSE Inspection, Monthly Auditing in line with Procore                   M       Site Management
                                                                    Inspection Matrix




                                                                                                                                              Project Hazard/Risk Assessment / Page 19 of 160

Used in these records

About this file

File size
836 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 836 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.