Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 80

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

   5. Public Protection Controls and Traffic Management
                                                                                                                  Proposed Controls
      Activity          Hazard                                                                                                                                                                          Responsible Person




                                           Risk
                                                                                                                                                                                               Risk




                                                    HOC




                                          Initial
                                          Rating
                                                                                     (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)




                                                                                                                                                                                             Residual
Implementation   Unauthorised access      HIGH      1     •       Temporary fencing will be erected as per manufacturers / suppliers’ specifications.                                         M         Site Management
                                                          •       Gates to be locked at all times after hours.
                                                          •       Site amenities (Site Office and Lunchroom) are locked each day.
                                                          •       All building entry point to be secured and locked at the conclusion of each day.

                 Unauthorised road /      HIGH      5         Written approval will be obtained from the relevant authority to close adjoining areas when excluding members                    L        Site Management
                 footpath closures                            of the public.
                                                              Any controls imposed by the authority will be fully implemented and monitored during the project.

                 Injuries to the public   HIGH      3         Hoardings erected on site will:                                                                                                 M         Project Management
                                                              •   be able to withstand a horizontal force of-                                                                                           Site Management
                                                                                2                    2
                                                                  –    500 N/m applied over 1m at the top of the hoarding midway between any two posts without
                                                                       deforming permanently &
                                                                  –    950 N/m2 applied over 1500mm2 at any point on the hoarding without fully penetrating the hoarding.
                                                              •   only have small gaps that are necessary to minimize wind resistance; and
                                                              •   extend to the gantry’s overhead platform (if it is part of a gantry).

                 Injuries to the public   HIGH      5         During installation, extension or reduction of catch platforms or screening, appropriate measures (i.e. such as                 M         Site Management
                                                              closing the adjoining area) will be taken to ensure that a falling object cannot injure a member of the public in                         Contract Partner
                                                              the adjoining area.

                 Falling objects          HIGH      3         For QLD Around the perimeter of the site based on the angle made between:                                                       M         Project Management
                                                              •   the horizontal and                                                                                                                    Site Management
                                                              •   an imaginary line drawn between the closest point where the public have access, to the highest point on                               HSE Advisor with
                                                                  the building/structure where work is to be done:                                                                                      BSBWHS414 OHS Cert
                                                                                                                                                                                                        4
                                                              The fencing will be:
                                                              •   (< 15o)            ☐ barricade or hoarding at least 900mm high.
                                                              •   (15o – 30o)        ☐ A hoarding at least 1800mm high.
                                                              •   (30o – 75o)     ☐ a hoarding at least 1800mm high that is fully sheeted with timber, plywood, metal, or
                                                                  sturdy synthetic sheets.
                                                              •   (75o or more) ☐ a hoarding at least 1800mm high that is fully sheeted with timber, plywood, metal, or
                                                                  sturdy synthetic sheets, AND one of the following:
                                                                  –    a gantry (or overhead protective structure), (incorporating the hoarding), or


                                                                                                                                                   Project Hazard/Risk Assessment / Page 20 of 160

Used in these records

About this file

File size
836 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 836 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.