                                                                                                             Proposed Controls
      Activity           Hazard                                                                                                                                                                    Responsible Person




                                           Risk
                                                                                                                                                                                          Risk




                                                     HOC




                                          Initial
                                          Rating
                                                                                (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)




                                                                                                                                                                                        Residual
                                                               –    the adjoining area is closed to prevent Falling objects on or otherwise hitting members of the public in
                                                                    that area; or
                                                               –    a catch platform with vertical sheeting or perimeter containment sheeting is installed.

                 Falling objects           N/A       3     For NSW Where work is carried out at a height exceeding 4m above the lowest ground level of the adjoining                    N/A        Project Management
                                            Is a           public place the following will be implemented:                                                                                         Site Management
                                            QLD            •   a hoarding at least 1800mm high that is fully sheeted with timber, plywood, metal or sturdy synthetic                               \ HSE Advisor with
                                          project.             sheets, AND one of the following controls:                                                                                          BSBWHS414 OHS Cert
                                                           •   a gantry (or overhead protective structure), (incorporating the hoarding), or                                                       4

                                                           •   the adjoining area is closed to prevent falling objects on or otherwise hitting members of the public in that
                                                               area; or
                                                           •   a catch platform with vertical sheeting or perimeter containment sheeting is installed.
                                                           Unless the ratio of the horizontal distance to the vertical height between the nearest boundary of the public
                                                           place and the where the work is carried out exceeds 2, in which case the requirements as per for QLD (above)
                                                           will be implemented.

                 Falling objects           HIGH      4     Vertical containment sheeting and perimeter containment screening will be used and installed not more than                    M         Site Management
                                                           1m below the height at which an object could fall from a surface or storey to an area below. The screens will be
                                                           capable of preventing an object that may reasonably be expected to hit it when falling from the level on which
                                                           work is being done.

                 Inadvertent access        HIGH      5     “Construction Site – No Unauthorised Entry” signs will be used to clearly identify areas on and around the                    M         Site Management
                                                           perimeter of sites as being a place of work.

                 Slips, trips and falls    HIGH      5     Public areas will be kept clear of any debris, trip or slip hazards and protected from any projectiles, dust etc. that        M         Site Management
                                                           may be released as a product of work undertaken (e.g. shared footpaths etc).


     5.1 Traffic Management
Planning          Traffic management       HIGH      5     Where work is undertaken that requires the closure of footpaths and roads, specific risk assessments,                         M         Site Management
                  incorrectly                              employment of traffic controllers and the preparation of traffic management plans will be undertaken in                                 HSE Advisor with
                  implemented                              accordance with statutory requirements and to suit the environment and method of work, which is required.                               BSBWHS414 OHS Cert
                                                                                                                                                                                                   4

                  Interactions with        HIGH      5     A traffic management plan / traffic guidance scheme will be developed by suitably qualified person as required                M         Site Management
                  members of the                           by legislation and include risk assessments, traffic controllers’ details and specific road barricading and signage                     Project Management
                  public                                   will be prepared and implemented prior to work commencing on a road or footpath.
                                                           Where construction activities require that vehicular traffic be impeded, or footpath closures are required a
                                                           Traffic Management Plan will be developed by a qualified person in accordance with the Manual of Uniform
                                                           Traffic Control Devices.


                                                                                                                                              Project Hazard/Risk Assessment / Page 21 of 160

Used in these records

About this file

File size
836 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 836 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.