Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls
Activity Hazard Responsible Person
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Residual
– the adjoining area is closed to prevent Falling objects on or otherwise hitting members of the public in
that area; or
– a catch platform with vertical sheeting or perimeter containment sheeting is installed.
Falling objects N/A 3 For NSW Where work is carried out at a height exceeding 4m above the lowest ground level of the adjoining N/A Project Management
Is a public place the following will be implemented: Site Management
QLD • a hoarding at least 1800mm high that is fully sheeted with timber, plywood, metal or sturdy synthetic \ HSE Advisor with
project. sheets, AND one of the following controls: BSBWHS414 OHS Cert
• a gantry (or overhead protective structure), (incorporating the hoarding), or 4
• the adjoining area is closed to prevent falling objects on or otherwise hitting members of the public in that
area; or
• a catch platform with vertical sheeting or perimeter containment sheeting is installed.
Unless the ratio of the horizontal distance to the vertical height between the nearest boundary of the public
place and the where the work is carried out exceeds 2, in which case the requirements as per for QLD (above)
will be implemented.
Falling objects HIGH 4 Vertical containment sheeting and perimeter containment screening will be used and installed not more than M Site Management
1m below the height at which an object could fall from a surface or storey to an area below. The screens will be
capable of preventing an object that may reasonably be expected to hit it when falling from the level on which
work is being done.
Inadvertent access HIGH 5 “Construction Site – No Unauthorised Entry” signs will be used to clearly identify areas on and around the M Site Management
perimeter of sites as being a place of work.
Slips, trips and falls HIGH 5 Public areas will be kept clear of any debris, trip or slip hazards and protected from any projectiles, dust etc. that M Site Management
may be released as a product of work undertaken (e.g. shared footpaths etc).
5.1 Traffic Management
Planning Traffic management HIGH 5 Where work is undertaken that requires the closure of footpaths and roads, specific risk assessments, M Site Management
incorrectly employment of traffic controllers and the preparation of traffic management plans will be undertaken in HSE Advisor with
implemented accordance with statutory requirements and to suit the environment and method of work, which is required. BSBWHS414 OHS Cert
4
Interactions with HIGH 5 A traffic management plan / traffic guidance scheme will be developed by suitably qualified person as required M Site Management
members of the by legislation and include risk assessments, traffic controllers’ details and specific road barricading and signage Project Management
public will be prepared and implemented prior to work commencing on a road or footpath.
Where construction activities require that vehicular traffic be impeded, or footpath closures are required a
Traffic Management Plan will be developed by a qualified person in accordance with the Manual of Uniform
Traffic Control Devices.
Project Hazard/Risk Assessment / Page 21 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.