Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls Responsible
Activity Hazards
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Residual
Inadequate temporary or EXTREME 4 Emergency lighting will be in accordance with AS/NZS 3012 requiring a minimum of 20 lux. Site Management
emergency light levels Electrical Contractor
Sufficient battery powered lighting (minimum 1 hour capacity) will be installed in stairways, passageways and adjacent to
Trips and Fall switchboards to allow safe access to and egress from the area if there is insufficient natural “lighting” for the case of
emergency.
Emergency Lighting shall be verified by measurement using an appropriate light level meter with records of the test
provided to Woollam.
Emergency Lighting is to be provided in designated access and egress paths and directly above and in front of
switchboards where natural lighting requirements cannot be met using natural lighting.
Inability to see site hazards. MEDIUM Site Management
Emergency Lights in the required areas be one of the following: Electrical Contractor
Slips, trips and falls.
a) Provide an average of 20lux at 900mm above floor level along the centre line of the corridor containing the
Emergency response process
emergency lights; or
b) Be installed using luminaires complying with the luminaire classification, mounting height, and spacing specified
in table 2,3,4 or 5 in AS/NZS 3012 or
c) Be installed based on calculations of luminance complying with the requirements of AS 2293 and using a
minimum horizontal luminance of 3 lux.
Inadequate temporary or MEDIUM 5 Emergency lighting design or paperwork verifying the emergency lux levels to be on site and available to Woollam. Electrical Contractor
emergency light levels
Commissioning of Faulty electrical installations HIGH 5 Records of all testing and verification to be retained on site and provided to Woollam. Site Management
lighting Electrical Contractor
installations
Use Unable to evacuate in MEDIUM 4 Lighting levels will be in accordance with AS/NZS 3012 as follows: Site Management
emergency. Electrical Contractor
- Emergency min: 20 lux,
Slips, trips and falls. - Designated access and egress paths: min 40 lux,
Ergonomic issues - General work areas: min 160 lux
Slips, trips and falls MEDIUM 5 Contract Partner’s will be required to provide suitable and sufficient task lighting for all work areas and workplaces Site Management
requiring a greater luminance to perform their specific activities in a safe manner. Contract Partner
Slips, trips and falls MEDIUM 5 Relocatable lighting will not be placed in a position where it presents a trip hazard. Site Management
Contract Partner
Maintenance and Slips, trips and falls MEDIUM 5 Emergency lighting will be verified and tested at intervals not exceeding 6 monthly and recorded. The testing documents Site Management
testing are to be retained on the project. Electrical Contractor
References AS/NZS 3012 Electrical Installations – Construction
AS 2293-Emergency lighting and exit signs for buildings
Project Hazard/Risk Assessment / Page 63 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.