Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls Responsible
Activity Hazards
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Residual
Exposure to live EXTREME 5 A copy of certification of the disconnection of services from the relevant authority is retained on site. Site
services (gas, Management
electrical, sewerage, Demolition
refrigerant gases etc.) Contract Partner
Flying particles / EXTREME 3 Controls will be in place to prevent falling objects hitting the public in adjoining areas by: Site
materials / falling Management
- Closing adjoining areas (to exclude all persons) to the extent necessary to prevent objects contacting persons. Demolition
objects
- Erecting perimeter containment screening along each part of the structure from which an object could fall. Contract Partner
- Another control measure to stop objects from falling on or hitting persons
Flying particles / EXTREME 4 Where overhead protective structures are provided over public walkways (between a public place and the building being Site
materials / falling demolished) the structures shall consist of a horizontal platform of solid construction with vertical supports and the Management
objects platform shall: Demolition
Contract Partner
- Extend from the common boundary to the edge of the carriageway for the full length of the boundary,
- Have a clear height above the footpath of not less than 2.1m,
- Terminate at the edge of the carriageway with a continuous solid up stand projecting not less than 0.5m above the
platform surface and
- Together with its supports, be designed for a uniformly distributed live load of not less than 7kPa.
Flying particles / EXTREME 5 Where the demolition is adjacent to another building controls will be implemented to protect: Site
materials / falling Management
- the other building; and Demolition
objects
- any person entering/leaving the other building; and Contract Partner
- any person who is on top of the other building (as applicable).
Flying particles / EXTREME 4 Where perimeter containment screening is erected or altered controls will be implemented to prevent any part of the Site
materials / falling screening falling on a person. Management
objects Demolition
Contract Partner
Flying particles / EXTREME 3 Where demolished materials are to be lowered onto / into a public place, the area will be properly barricaded to prevent Site
materials / falling members of the public entering. Management
objects Demolition
Contract Partner
Flying particles / EXTREME 4 Where scaffolding is provided it shall comply with AS 1576 Scaffolding (SET) and shall- Site
materials / falling Management
- be erected before the demolition work starts on the side of the building that is being demolished where it faces a public Demolition
objects place and may be kept erected until the work is finished; and Contract Partner
- be certified by an engineer; and
- be rated as heavy duty; and
Project Hazard/Risk Assessment / Page 70 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.