Skip to the record
The only place to find full transcripts.

Council archive · source document

Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 80

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                                            Proposed Controls                                                                          Responsible
    Activity           Hazards




                                             Risk
                                                                                                                                                                                                            Risk




                                                           HOC




                                            Initial
                                            Rating
                                                                                               (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)                                           Person



                                                                                                                                                                                                          Residual
                                                                  - have each platform extend the full width of the scaffold frame; about the building; and extend into any openings of the
                                                                       building for a sufficient distance to catch any falling material.
                                                                  - The above will occur in accordance with the relevant state legislation.
               Flying particles /       EXTREME             5     The demolition area will be defined, and non-essential personnel will be excluded from this area.                                                        Site
               materials / falling                                                                                                                                                                                    Management
               objects                                                                                                                                                                                                 Demolition
                                                                                                                                                                                                                     Contract Partner
               Flying particles /       EXTREME             5     Signs stating “Danger! Demolition in Progress” or similar will be erected.                                                                               Site
               materials / falling                                                                                                                                                                                    Management
               objects                                                                                                                                                                                                 Demolition
                                                                                                                                                                                                                     Contract Partner
               Emergency response       EXTREME             5     At least two clearly marked, illuminated and unobstructed access and egress routes are provided as an emergency exit                                     Site
               processes                                          connecting all un-demolished floors to the nearest street.                                                                                          Management
                                                                                                                                                                                                                       Demolition
                                                                                                                                                                                                                     Contract Partner
               Falling objects          EXTREME             3       Penetrations will be covered in alignment with Penetrations section                                                                                    Site
                                                                                                                                                                                                                      Management
                                                                                                                                                                                                                       Demolition
                                                                                                                                                                                                                     Contract Partner
References      AS 2601 The demolition of structures
                AS 1576 Scaffolding (SET)

Review and      Safety Interactions, Task Observations, Weekly HSE Inspection, Monthly Audit as per Procore Inspection matrix
Monitoring




                                                                                                                                                        Project Hazard/Risk Assessment / Page 71 of 160

Used in these records

About this file

File size
836 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 836 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.