Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls Responsible
Activity Hazards
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Residual
With a competent person defined as –
a person who has acquired, through training, qualifications or experience knowledge and skills, including:
• sound knowledge of relevant Australian Standards, relevant codes of practice and other relevant legislation,
• ability to read and interpret drawings
• sound knowledge of, and competence in, the risk management process for the erecting, altering and dismantling of formwork including:
- hazard identification and risk assessment - measures to control exposure to risks - safe work practices and procedures - how to
plan and prepare formwork.
Planning for Activity EXTREME 5 All tasks involving formwork will have an approved SWMS in place. The SWMS will address all high-risk activities including work at heights Site
formwork planning and for tasks that are undertaken where a worker could fall 2m or more and scaffold stripping activities along with formwork hazards and Management
installation hazard controls. Formwork
identification Contract
Partner
Falling objects EXTREME 3 Where works to erect or dismantle formwork are undertaken, the adjoining area will be closed to the public or perimeter containment Site
screening will be erected. Management
Where works to erect or dismantle formwork are undertaken, the area on site will be excluded to non-essential workers not involved in the
task.
Access and EXTREME 3 QLD – Site
egress Management
Stair tread access and egress is to be used as the primary source of access to a formwork deck unless it is not reasonably practicable to do
Slips trips. so.
Emergency Access requirements as per Formwork code of practice 2016 are to be applied:
retrieval
Access and EXTREME 4 NSW - Access to the live working deck will be through one of the following methods. Site
egress Management
- Extension Ladder – Tied top and bottom, at an angle of 4:1 and protrude at least 1 metre above the landing height.
Slips trips. - Hoist
Emergency - Internal stairs
retrieval
- Portable stairs
- Mobile scaffold stairs
- Perimeter scaffold stairs.
Project Hazard/Risk Assessment / Page 111 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.