Council archive · source document
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls
Activity Risk Responsible Person
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Residual
Contract Partner
Hose whip MEDIUM 5 Use concrete that is a pumpable mix by the supplier and do not let solidify in the line as it may cause blockages. Site Management
Do not stretch the hose to reach the pouring location. Contract Partner
Cleaning the pump Concrete wash off MEDIUM 4 Kibble tray or alike will be used for trailer mounted concrete pumps to contain excess concrete and water run-off. Site Management
into stormwater
Contract Partner
Concrete wash off MEDIUM 5 A ‘Concrete washout area’ will be clearly defined complying with environmental protection legislation and local Site Management
into stormwater authority requirements.
References AS 2550.15 Cranes, hoists and winches – Safe use – Concrete placing equipment.
17.2 Concrete Placement
Planning for concrete Structural failure EXTREME 5 Prior to the placement of concrete, the design engineer will verify that the placement of reo and starter bars meets Site Management
placement the intended structural design.
Contract Partner
Musculoskeletal HIGH 5 Contractors to manage their own labour and job rotation. Contract Partner
injuries
Concrete placement Person or EXTREME 5 Edge protection in place for live edges, stair voids and penetrations that cannot be covered. Site Management
equipment falling
from heights Contract Partner
Person or EXTREME 5 Penetrations are to be covered and be secured in place as per penetration guide. Site Management
equipment falling
from heights Contract Partner
Access HIGH 4 Barricades, flagging and signage will be erected for concrete pour area. Site Management
Contract Partner
Contact with sharp HIGH 1 Starter bar caps shall be installed in accordance with the manufacture’s recommendation. Starter bar caps shall Site Management
objects provide protection against impalement. Starter bar caps which have damage or have deteriorated to a condition
where they no longer protect against impalement shall be removed from service. Contract Partner
Project Hazard/Risk Assessment / Page 118 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.