                                                                                                                             Proposed Controls
        Activity                 Risk                                                                                                                                                                                 Responsible Person




                                                  Risk
                                                                                                                                                                                                           Risk




                                                                    HOC




                                                 Initial
                                                 Rating
                                                                                                  (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)




                                                                                                                                                                                                         Residual
                                                                                                                                                                                                                    Contract Partner

                        Hose whip              MEDIUM           5         Use concrete that is a pumpable mix by the supplier and do not let solidify in the line as it may cause blockages.                        Site Management
                                                                          Do not stretch the hose to reach the pouring location.                                                                                    Contract Partner

Cleaning the pump       Concrete wash off      MEDIUM           4         Kibble tray or alike will be used for trailer mounted concrete pumps to contain excess concrete and water run-off.                        Site Management
                        into stormwater
                                                                                                                                                                                                                    Contract Partner

                        Concrete wash off      MEDIUM           5         A ‘Concrete washout area’ will be clearly defined complying with environmental protection legislation and local                           Site Management
                        into stormwater                                   authority requirements.

References              AS 2550.15 Cranes, hoists and winches – Safe use – Concrete placing equipment.


    17.2             Concrete Placement
Planning for concrete   Structural failure     EXTREME          5         Prior to the placement of concrete, the design engineer will verify that the placement of reo and starter bars meets                      Site Management
placement                                                                 the intended structural design.
                                                                                                                                                                                                                    Contract Partner

                        Musculoskeletal        HIGH             5         Contractors to manage their own labour and job rotation.                                                                                  Contract Partner
                        injuries

Concrete placement      Person or              EXTREME          5         Edge protection in place for live edges, stair voids and penetrations that cannot be covered.                                             Site Management
                        equipment falling
                        from heights                                                                                                                                                                                Contract Partner


                        Person or              EXTREME          5         Penetrations are to be covered and be secured in place as per penetration guide.                                                          Site Management
                        equipment falling
                        from heights                                                                                                                                                                                Contract Partner


                        Access                 HIGH             4         Barricades, flagging and signage will be erected for concrete pour area.                                                                  Site Management
                                                                                                                                                                                                                    Contract Partner

                        Contact with sharp     HIGH             1         Starter bar caps shall be installed in accordance with the manufacture’s recommendation. Starter bar caps shall                           Site Management
                        objects                                           provide protection against impalement. Starter bar caps which have damage or have deteriorated to a condition
                                                                          where they no longer protect against impalement shall be removed from service.                                                            Contract Partner




                                                                                                                                                           Project Hazard/Risk Assessment / Page 118 of 160

Used in these records

About this file

File size
836 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 836 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.