Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls
Activity Risk Responsible Person
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Residual
Another structural element failing and falling to the ground as a result of being struck by the crane or the panel being
lifted.
Consider neighbouring properties and public access ways – refer traffic management if closure required.
For vertical construction – exclusion of 1 floor below panel flight path.
Failure of structural EXTREME 5 Confirmation that pre-cast panel grout mix is as per engineers’ requirements and site Pre-Cast / Tilt Panel Installation Site Manager
grout Checklist
Contract Partner
References AS 3850 – Prefabricated concrete elements General requirements.
AS 1379 – Specification and supply of concrete
17.4 Tilt Up Panels
Planning for the Inadequate EXTREME 5 Construct and Erect Precast Pre-Cast / Tilt Panel Installation Checklist will be actioned prior to the lifting of tilt-up Site Management
construction and planning in advance panels.
erection of tilt up of the activity Contract Partner
panels All parties will sign off on the confirmation of completion of all items.
Insufficient crane/ EXTREME 3 Crane lifting capacity is not to exceed 85% without approval from Project Manager and Team HSE Manager Site Management
lifting equipment
considerations Contract Partner
Person or EXTREME 3 Where panel beds create a risk of a person falling during concrete placement handrails to be installed Site Management
equipment falling
from heights Contract Partner
Panel beds and EXTREME 5 The supervising engineer is to inspect and assess the following procedures: Site Management
planning not
compliant Initial casting of tilt up or pre-cast panels for compliance with shop drawings Contract Partner
Initial lifting of tilt up or pre-cast panels and
Subsequent casting and lifting of panels at random intervals
Workers not trained EXTREME 5 The panel erection crew must be holders of at least an intermediate rigging (RI) licence or be trainees. Trainees Site Management
/ licenced in the engaged in formal training under RTO must be supervised and logbooks showing previous training must be kept.
activity Contract Partner
Project Hazard/Risk Assessment / Page 121 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.