Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 80

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                                  Proposed Controls
       Activity              Risk                                                                                                                                                                          Responsible Person




                                            Risk
                                                                                                                                                                                                Risk




                                                         HOC




                                           Initial
                                           Rating
                                                                                       (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)




                                                                                                                                                                                              Residual




                     Injury to worker     EXTREME    5         Block saw to be set up in a safe manner free from access and egress ways, safe distance from electrical boards and /                      Site Management
                     from incorrect use                        or other plant and equipment with an adequate exclusion zone established. Block saw is to be operated in accordance
                     of saw cutter                             with manufacturer’s instruction.                                                                                                          Contract Partner



    17.6          Post Tensioning
Planning             Training and         EXTREME    5         All tasks involving the installation of post tension equipment including pre-pour and post-pour of concrete will have an                  Site Management
                     instruction                               approved SWMS in place.
                                                                                                                                                                                                         Contract Partner

                     Cable rupturing      EXTREME    5         Post Tension documentation will be designed and provided by a professional structural engineer prior to the work                          Site Management
                                                               being commenced on site.
                     Injury to workers                                                                                                                                                                   Contract Partner
                                                               Design changes will be authorised and verified by qualified engineer                                                                      Engineer

                     Collapse of          EXTREME    3         Formwork deck to be signed over by competent person verifying the point loading is per engineer design, approved to                       Site Management
                     formwork                                  take the live load of a PT coil.



                                                                                                                                                Project Hazard/Risk Assessment / Page 126 of 160

Used in these records

About this file

File size
836 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 836 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗