Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Proposed Controls
Activity Risk Responsible Person
Risk
Risk
HOC
Initial
Rating
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Residual
Injury to worker EXTREME 5 Block saw to be set up in a safe manner free from access and egress ways, safe distance from electrical boards and / Site Management
from incorrect use or other plant and equipment with an adequate exclusion zone established. Block saw is to be operated in accordance
of saw cutter with manufacturer’s instruction. Contract Partner
17.6 Post Tensioning
Planning Training and EXTREME 5 All tasks involving the installation of post tension equipment including pre-pour and post-pour of concrete will have an Site Management
instruction approved SWMS in place.
Contract Partner
Cable rupturing EXTREME 5 Post Tension documentation will be designed and provided by a professional structural engineer prior to the work Site Management
being commenced on site.
Injury to workers Contract Partner
Design changes will be authorised and verified by qualified engineer Engineer
Collapse of EXTREME 3 Formwork deck to be signed over by competent person verifying the point loading is per engineer design, approved to Site Management
formwork take the live load of a PT coil.
Project Hazard/Risk Assessment / Page 126 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Project Hazard_Risk Assessment Ozcare Noosa RACF 23-042024 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 836 KB (small file)
- File type
No other editions are linked here.