Table 7.1: Estimated Peak Hour Development Traffic Generation
                               Proposed
   Peak Hour Period                         Gen. Rate        Total Trips                   Trips IN              Trips OUT
                                 Area
 Weekday AM                                     3.9                  42              50%              21      50%            21
 Weekday PM                    1,088 m2         3.8                  42              50%              21      50%            21
 Saturday AM                                    6.7                  73              50%              37      50%            37



7.4.2        Directional Distribution
The directional distribution of above identified additional development traffic is based on the apparent
distribution of traffic to and from the existing Bunnings development as per the traffic movement survey.

The resulting traffic volumes associated with the proposed development are shown in Appendix C.

7.5          Site Accesses Analysis
The existing northern Bunnings site access and the two proposed site accesses have been analysed using SIDRA
9 analysis software for the estimated 10-year design horizon (2034) peak hour volumes with inclusion of the
proposed developments traffic demands. All three site accesses were analysed as a ‘network’ to enable the
potential interaction between the accesses to be modelled and assessed.

Detailed analysis outputs are included in Appendix D and the results are summarised as follows.

7.5.1        Existing Bunnings Northern Access
Table 7.2 summarises the analysis results. The analysis indicates that all movements at the site access would
operate with ample spare capacity and very good performance. Importantly, the 95th queue length on the
right turn into the access would not exceed 1 vehicle. This means that shared use of the right turn lane with
the proposed entry-only access is acceptable and would not adversely impact the performance of either
access.

Table 7.2: SIDRA Analysis Summary – Existing Bunnings Northern Access

  Peak Period             Right Turn from Gateway Drive                               Exit from Site Access
                       DoS (%)        Avg. Delay        95 th %ile          DoS              Avg. Delay     95 th %ile
                                        (sec)           Queue (m)                              (sec)       Queue (m)
  Weekday AM             1.4               6               0.5              2.4                  10            0.7
  Weekday PM             0.9               6               0.3              1.9                   9            0.5
  Saturday               1.8               6               0.6              2.8                   8            0.7




Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD
Reference: 21BRT0226

Used in these records

About this file

File size
10.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Traffic Impact Assessment.pdf · 10.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.