Table 7.1: Estimated Peak Hour Development Traffic Generation
Proposed
Peak Hour Period Gen. Rate Total Trips Trips IN Trips OUT
Area
Weekday AM 3.9 42 50% 21 50% 21
Weekday PM 1,088 m2 3.8 42 50% 21 50% 21
Saturday AM 6.7 73 50% 37 50% 37
7.4.2 Directional Distribution
The directional distribution of above identified additional development traffic is based on the apparent
distribution of traffic to and from the existing Bunnings development as per the traffic movement survey.
The resulting traffic volumes associated with the proposed development are shown in Appendix C.
7.5 Site Accesses Analysis
The existing northern Bunnings site access and the two proposed site accesses have been analysed using SIDRA
9 analysis software for the estimated 10-year design horizon (2034) peak hour volumes with inclusion of the
proposed developments traffic demands. All three site accesses were analysed as a ‘network’ to enable the
potential interaction between the accesses to be modelled and assessed.
Detailed analysis outputs are included in Appendix D and the results are summarised as follows.
7.5.1 Existing Bunnings Northern Access
Table 7.2 summarises the analysis results. The analysis indicates that all movements at the site access would
operate with ample spare capacity and very good performance. Importantly, the 95th queue length on the
right turn into the access would not exceed 1 vehicle. This means that shared use of the right turn lane with
the proposed entry-only access is acceptable and would not adversely impact the performance of either
access.
Table 7.2: SIDRA Analysis Summary – Existing Bunnings Northern Access
Peak Period Right Turn from Gateway Drive Exit from Site Access
DoS (%) Avg. Delay 95 th %ile DoS Avg. Delay 95 th %ile
(sec) Queue (m) (sec) Queue (m)
Weekday AM 1.4 6 0.5 2.4 10 0.7
Weekday PM 0.9 6 0.3 1.9 9 0.5
Saturday 1.8 6 0.6 2.8 8 0.7
Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD
Reference: 21BRT0226
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E - Traffic Impact Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.