7.5.2        Proposed Southern Access (Entry-only)
Table 7.3 summarises the analysis results. The analysis indicates that all movements at the site access would
operate with ample spare capacity and very good performance. Importantly, the 95th queue length on the
right turn into the access would not exceed 1 vehicle. As per the existing Bunnings site access analysis this
means that shared use of the right turn lane with the proposed entry-only access is acceptable and would
not adversely impact the performance of either access.

Table 7.3: SIDRA Analysis Summary – Proposed Entry-only Access

  Peak Period             Right Turn from Gateway Drive
                       DoS (%)        Avg. Delay        95 th %ile
                                        (sec)          Queue (m)
  Weekday AM             1.5               3               0.5
  Weekday PM             1.4               3               0.5
  Saturday               2.4               3               0.8



7.5.3        Proposed Northern Access (Exit-only)
Table 7.4 summarises the analysis results. The analysis indicates that all movements at the site access would
operate with ample spare capacity and very good performance. The exit movements would operate with
minimal delay and queuing.

Table 7.4: SIDRA Analysis Summary – Proposed Exit-only Access

  Peak Period                    Exit from Site Access
                        DoS           Avg. Delay        95 th %ile
                                        (sec)          Queue (m)
  Weekday AM             1.9               8               0.5
  Weekday PM             1.9               7               0.5
  Saturday               3.1               7               0.9



7.6          Conclusion
The analysis indicates that the proposed site accesses would operate with ample spare capacity and would
not adversely impact the operation and performance of the existing Bunnings site access located
immediately south of the subject site.




Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD
Reference: 21BRT0226

Used in these records

About this file

File size
10.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E - Traffic Impact Assessment.pdf · 10.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.