Original source · versioned page text
2014-05-20 Planning & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 20 MAY 2014
Page 63 of 143
Document No: "[Click to insert document #]"
Revision No: 001
Effective date: 6 March 2014
Next Review Date: 30 May 2014 |
Unit Wale! . . ° = -
Interim Connections Policy — Schedule 1: Criteria
ee ol aL TET E merlin mercer Standard Conditions
Sands tale plea agin (These Connections Criteria must be satisfied for a Connection to be (These conditions apply to all Standard
sdiaed Areas) within the Standard Connection category) Connections)
oa Connections to lots that are not completely within the Sewerage
Connection Area.
Copynght © Unitywater Page 10 of 26
Printed copies are uncontrolled
Page 63 of 143See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.