Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2014-05-20 Planning & Organisation Committee Agenda

of 143

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   20 MAY 2014




                                                                 Page 64 of 143

Document No: "{Click to insert document #]"
                                                                                                                                         Revision No: 001
         @                                                                                                                     Effective date: 6 March 2014      —
                                                                                                                            Next Review Date: 30 May 2014
  Unitywater                                                      :                     :                :                                     et    ae
        Y                                                 Interim Connections                      Policy — Schedule 1: Criteria

Table 2 — Connection Criteria for Other Connections
                                                                                                            Schedule 1, Table 2 — applies for Other Connections
        Location                               Connection                                                  Decision Criteria
  (Where the land is located)           (The type of Connection sought)                        (The application is assessed against these criteria)
Inside a Connection Area
Water Connection Area           New water Connection or the Alteration or         |e  The availability of relevant infrastructure to service the land;
                                ALN OF ea SOPHIE Ween SAN UIRIC                   ¢   The demands generated by the use or the proposed use, including fire
                                                                                      flow demands;
                                                                                  e   The existing and planned capacity available in the relevant network
                                                                                      and the impacts of the demand on the standards of service;
                                                                                  e   Any constraints affecting the Connection of infrastructure and the
                                                                                      provision of the relevant service to the land or the supply of the
                                                                                      relevant level of service to other customers:
                                                                                  e   If works design plans included in the application — the technical
                                                                                      feasibility of the engineering design and its compliance with the SEQ
                                                                                      WS & S Design and Construction Code.
                                                                                  «   Example of a constraint (for all locations and Connections) — a constraint may include
                                                                                      an environmental constraint such as the existence of sensitive habitat that may affect
                                                                                      the location of new Network Infrastructure on or to the land.
Sewerage         Connection | New sewerage Connection or the Alteration or | *        The availability of relevant infrastructure to service the land;
Ares                            Raccinrienton    OF   RH   Lemmon     Seat        e   The demands generated by the use, including the biological/chemical
                                Connection.                                                 '
                                                                                      loads;
                                                                                  e   The existing and planned capacity available in the relevant network

 Copyright © Unitywater                                                                                                                   Page 11 of 26
Printed copies are uncontrolled

                                                                                                                                                    Page 64 of 143
Log in to download the original file

2014-05-20 Planning & Organisation Committee Agenda(PDF, 7MB).pdf · 7.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.