PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 20 MAY 2014
Page 64 of 143
Document No: "{Click to insert document #]"
Revision No: 001
@ Effective date: 6 March 2014 —
Next Review Date: 30 May 2014
Unitywater : : : et ae
Y Interim Connections Policy — Schedule 1: Criteria
Table 2 — Connection Criteria for Other Connections
Schedule 1, Table 2 — applies for Other Connections
Location Connection Decision Criteria
(Where the land is located) (The type of Connection sought) (The application is assessed against these criteria)
Inside a Connection Area
Water Connection Area New water Connection or the Alteration or |e The availability of relevant infrastructure to service the land;
ALN OF ea SOPHIE Ween SAN UIRIC ¢ The demands generated by the use or the proposed use, including fire
flow demands;
e The existing and planned capacity available in the relevant network
and the impacts of the demand on the standards of service;
e Any constraints affecting the Connection of infrastructure and the
provision of the relevant service to the land or the supply of the
relevant level of service to other customers:
e If works design plans included in the application — the technical
feasibility of the engineering design and its compliance with the SEQ
WS & S Design and Construction Code.
« Example of a constraint (for all locations and Connections) — a constraint may include
an environmental constraint such as the existence of sensitive habitat that may affect
the location of new Network Infrastructure on or to the land.
Sewerage Connection | New sewerage Connection or the Alteration or | * The availability of relevant infrastructure to service the land;
Ares Raccinrienton OF RH Lemmon Seat e The demands generated by the use, including the biological/chemical
Connection. '
loads;
e The existing and planned capacity available in the relevant network
Copyright © Unitywater Page 11 of 26
Printed copies are uncontrolled
Page 64 of 143See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.