Original source · versioned page text
2014-05-20 Planning & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 20 MAY 2014
Page 65 of 143
Document No: "[Click to insert document #]"
Revision No: 001
Effective date: 6 March 2014 |
Next Review Date: 30 May 2014
Unitywater . . : PM nttaiet
a: Interim Connections Policy — Schedule 1: Criteria
and the impacts of the demand on the standards of service;
e Any constraints affecting the Connection of infrastructure and the
provision of the relevant service to the land or the supply of the
relevant level of service to other customers;
e If works design plans included in the application — the technical
feasibility of the engineering design and its compliance with the SEQ
WS & S Design and Construction Code.
Inside a Future Connection Area
Water Future Connection New water Connection or the Alteration or e The availability of relevant infrastructure to service the land;
a EAREORNIECIION Ct ar someting water Connecwon e The demands generated by the use or the proposed use, including fire
flow demands;
e The existing and planned capacity available in the relevant network
and the impacts of the demand on the standards of service;
e Any constraints affecting the Connection of infrastructure and the
provision of the relevant service to the land or the supply of the
relevant level of service to other customers;
e If works design plans included in the application — the technical
feasibility of the engineering design and its compliance with the SEQ
WS & S Design and Construction Code.
Sewerage Future | New sewerage Connection or the Alteration or | ¢ The availability of relevant infrastructure to service the land;
Connection Area oe of on Sxistng = sewerage | The demands generated by the use or the proposed use, including the
: a biological/chemical loads;
¢ The existing and planned capacity available in the relevant network
Copynght © Unitywater Page 12 of 26
Printed copies are uncontrolled
Page 65 of 143See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.