PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   20 MAY 2014




                                                                 Page 65 of 143

Document No: "[Click to insert document #]"
                                                                                                                                      Revision No: 001
                                                                                                                            Effective date: 6 March 2014       |
                                                                                                                         Next Review Date: 30 May 2014
  Unitywater                                                     .                    .               :                               PM nttaiet
        a:                                              Interim Connections                     Policy — Schedule 1:                   Criteria

                                                                                    and the impacts of the demand on the standards of service;
                                                                                e   Any constraints affecting the Connection of infrastructure and the
                                                                                    provision of the relevant service to the land or the supply of the
                                                                                    relevant level of service to other customers;
                                                                                e   If works design plans included in the application — the technical
                                                                                    feasibility of the engineering design and its compliance with the SEQ
                                                                                    WS & S Design and Construction Code.

Inside a Future Connection Area
Water Future Connection        New water Connection or the Alteration or        e   The availability of relevant infrastructure to service the land;
a                              EAREORNIECIION Ct ar someting water Connecwon    e   The demands generated by the use or the proposed use, including fire
                                                                                    flow demands;
                                                                                e   The existing and planned capacity available in the relevant network
                                                                                    and the impacts of the demand on the standards of service;
                                                                                e   Any constraints affecting the Connection of infrastructure and the
                                                                                    provision of the relevant service to the land or the supply of the
                                                                                    relevant level of service to other customers;
                                                                                e   If works design plans included in the application — the technical
                                                                                    feasibility of the engineering design and its compliance with the SEQ
                                                                                    WS & S Design and Construction Code.
Sewerage             Future | New sewerage Connection or the Alteration or | ¢      The availability of relevant infrastructure to service the land;
Connection Area                oe              of   on    Sxistng = sewerage |      The demands generated by the use or the proposed use, including the
                                :      a                                            biological/chemical loads;
                                                                                ¢   The existing and planned capacity available in the relevant network
 Copynght © Unitywater                                                                                                                Page 12 of 26
Printed copies are uncontrolled

                                                                                                                                                 Page 65 of 143
Log in to download the original file

2014-05-20 Planning & Organisation Committee Agenda(PDF, 7MB).pdf · 7.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.