Unity water . . . “WS pition t
sa Interim Connections Policy — Schedule 1: Criteria
and the impacts of the demand on the standards of service;
e Any constraints affecting the Connection of infrastructure and the
provision of the relevant service to the land or the supply of the
relevant level of service to other customers;
e If works design plans included in the application — the technical
feasibility of the engineering design and its compliance with the SEQ
WS & S Design and Construction Code.
Outside all Connection Areas and Future Connection Areas
Outside all Connection | New water Connection or the Alteration or|e The availability of relevant infrastructure to service the land;
pee x and petetes Meconnection of an existing water Connection. e The demands generated by the use or the proposed use, including fire
Connection Area :
flow demands;
e The existing and planned capacity available in the relevant network
and the impacts of the demand on the standards of service;
e Impacts of the Connection on existing and/or planned services and
infrastructure in relevant Connection or Future Connection Areas,
including standard of service impacts;
e Any constraints affecting the Connection of infrastructure and the
provision of the relevant service to the land or the supply of the
relevant level of service to other customers;
e If works design plans included in the application — the technical
feasibility of the engineering design and its compliance with the SEQ
WS & S Design and Construction Code.
New sewerage Connection or the Alteration or | « The availability of relevant infrastructure to service the land;
ee ee ee eee e« The demands generated by the use or the proposed use, including the
Copyright © Unitywater Page 13 of 26
Printed copies are uncontrolled
Page 66 of 143See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.