Council archive · source document
App2.4 Program Preventative Maintenance Agreement · OPW16/0021
From the archive OPW16/0021- Response Landscape. File date in the archive: 2016-05-16 04:00.
(SCHEDULE 7 )
Irrigation–
Individual Components Inspection and Maintenance Matrix:
Area of Inspection Inspection Procedure as applicable Necessary Action
Inspection Item
Attention Frequency to detailed/general inspections
6 Visits in Check power / operation and run self Service / Repair / Replace as required
Galcon Irrigation total with diagnostic test if faulty; Call the Manufacturer for
Controller alternate (Refer to FytoWall Irrigation Users Technical support
detailed and Guide)
general Check that the solenoid valve is Service / Repair / Replace as required
Solenoid valve with
inspections, regulating flow, (Listen for clicks faulty valve/component
Flow Control
sounding) open on actuation
General
Pressure Reducing Inspection Inspect / clean / replace as per
Check static / operational pressuring
valve required manufactures Instructions
6 times year
Ball valves / from within As above As above
the building
Automated Unscrew, check port, check filter,
Techfilter Detailed As above
Irrigation should appear in clean condition
Inspection
individual
required 5
components
times a year
from
specialist
access
equipment
Visits to be
spread
evenly over
the 12
month
period
Fytowall (Australia) Form FWF-10 / Rev D Page 15 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
App2.4 Program Preventative Maintenance Agreement.pdfRelated documentApplication case desk ↗
About this file
- File size
- 635 KB (small file)
- File type
No other editions are linked here.