Attachment C- REC14.0005 Negotiated Decision Notice

of 10

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                      REC14/0005

UNITYWATER

Important Advisory Note - The following Unitywater conditions are applied in accordance with
the Chapter 4c, part 7 and sections 135 and 140(c) South East Queensland (Distribution and
Retail) Restructuring Act 2009 and Unitywater’s Interim Connections Policy. The conditions
below form part of a water connection aspect which are taken to be a water approval for a
staged connection. You are entitled to appeal against the water connection aspects of this
application in accordance with section 99BRAY and Chapter 4c, part 4, Divisions 1 and 2 of
 the South East Queensland (Distribution and Retail) Restructuring Act 2009. Unitywater can
be contacted as follows:
Phone: 1300 0 Unity (1300 086 489)
Email: [email protected]
Web: www.unitywater.com

21.   Reticulated water must be provided to each lot in the development. This must include:
      (a) Ensuring that existing internal water pipes are wholly contained within the lot they
            will serve.
      (b) An approved water meter for each lot in accordance with Unitywater and SEQ
            Standard Drawings.
      (c) Provision of a water service to service proposed all lots in accordance with
            Unitywater and SEQ Standard Drawings.
      (d) Provision of a pipeline conduit under Gateway Drive in accordance with Unitywater
            and SEQ Standard Drawings.
      (e) An approved 150mm diameter water service connection to each lot in accordance
            with Unitywater requirements.

22.   Water meters must be located on alternative boundaries to electrical pillars.

23.   Reticulated sewerage must be provided to each lot in the development. This must
      include:
      (a) Ensuring existing sewer house drains are wholly contained within the Lot they will
            serve.
      (b) Provision of sewerage infrastructure to the property boundaries of Lot 103.

24.   Written approval to enter and construct must be obtained from the owners of properties
      through which external sewers will traverse, and be submitted with lodgment of the
      associated development application for Operational Works.

25.   Easements of between 3 and 10 metres must be provided over all Unitywater sewers
      located within property boundaries in accordance with the SEQ standards. Easements
      shall be centred over the pipe. Easement terms shall be the most current registered
      dealing held by the Department of Natural Resources & Mines and shall not be altered
      or amended.

26.   Written approval to enter and construct must be obtained from the owners of properties
      through which external watermains will traverse. This must include approval for an
      easement over the mains, and be submitted with lodgment of the associated
      development application for Operational Works.

27.   A minimum clearance of 1.5 metres must be maintained between Unitywater sewers and
      proposed building envelopes, buildings and other structures.



                                                                                 Page 5 of 10
Log in to download the original file

Attachment C- REC14.0005 Negotiated Decision Notice.pdf · 113 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.