RFI traffic updated 2016
Attached to the e-mail MCU15/0111 Information Request Response to Concurrence Agency - 2-4 Lamonts Rd & 19 Trading post Rd, Cooroy - email 1 of 2.
The intersection under base year 2018 traffic volumes without the development traffic volumes satisfies the TMR
warrants for channelised right turn treatment lane from the southern approach. Refer Figure 3-2 TMR warrants, showing
in grey the 2018 traffic volumes without the development. In the future design horizon year 2028 in the fully developed
scenario, the TMR warrants for channelised right turn lane from the southern approach, as well as the short auxiliary left
turn lane from the northern approach are satisfied, refer Figure 3-2.
Peak Hour Turn Movement Major Road Traffic
From Major Road Volume Parameter
2018 Base Year Without Development
QR = 39 vph max during AM Peak Hour QM = 1041 vpd total two-way AM Peak Hour
QR = 41 vph max during PM Peak Hour QM = 1076 vpd total two-way PM Peak Hour
QL = 3 vph max during AM Peak Hour QM = 752 vpd total two-way AM Peak Hour
QL = 3 vph max during PM Peak Hour QM = 546 vpd total two-way PM Peak Hour
2028 Design Horizon Year With Development
QR = 77 vph max during AM Peak Hour QM = 1520 vph total two-way AM Peak Hour
QR = 108 vph max during PM Peak Hour QM = 1572 vph total two-way PM Peak Hour
QL = 6 vph max during AM Peak Hour QM = 1095 vph total one-way AM Peak Hour
QL = 10 vph max during PM Peak Hour QM = 785 vph total one-way PM Peak Hour
Figure 3-2: Warrant for Turn Treatments at Elm Street / Pearsons Road Intersection
(Source: DTMR Roads Planning and Design Manual, Chapter 13, Figure 13.23)
It is understood that as part of the previous development conditions for the site, that a commitment stands to upgrade the
Elm Street / Pearsons Road intersection to include a channelised right turn treatment at the southern approach and a
short auxiliary left turn lane from the northern approach. Please refer to Council’s Development Works Approval No.
132007.2398.02. Please also refer to Figure 3-3 showing the functional road layout plan by Calibre Consulting Drawing
15-001261-RF02.
B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS COOROY RETIREMENT COMMUNITY | 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.