Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

RFI traffic updated 2016

Attached to the e-mail MCU15/0111 Information Request Response to Concurrence Agency - 2-4 Lamonts Rd & 19 Trading post Rd, Cooroy - email 1 of 2.

of 49

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

The intersection under base year 2018 traffic volumes without the development traffic volumes satisfies the TMR
warrants for channelised right turn treatment lane from the southern approach. Refer Figure 3-2 TMR warrants, showing
in grey the 2018 traffic volumes without the development. In the future design horizon year 2028 in the fully developed
scenario, the TMR warrants for channelised right turn lane from the southern approach, as well as the short auxiliary left
turn lane from the northern approach are satisfied, refer Figure 3-2.




                            Peak Hour Turn Movement                          Major Road Traffic
                                From Major Road                              Volume Parameter
            2018 Base Year Without Development
                    QR = 39 vph max during AM Peak Hour          QM = 1041 vpd total two-way AM Peak Hour
                    QR = 41 vph max during PM Peak Hour          QM = 1076 vpd total two-way PM Peak Hour
                    QL = 3 vph max during AM Peak Hour           QM = 752 vpd total two-way AM Peak Hour
                    QL = 3 vph max during PM Peak Hour           QM = 546 vpd total two-way PM Peak Hour
            2028 Design Horizon Year With Development
                    QR = 77 vph max during AM Peak Hour          QM = 1520 vph total two-way AM Peak Hour
                    QR = 108 vph max during PM Peak Hour         QM = 1572 vph total two-way PM Peak Hour
                    QL = 6 vph max during AM Peak Hour           QM = 1095 vph total one-way AM Peak Hour
                    QL = 10 vph max during PM Peak Hour          QM = 785 vph total one-way PM Peak Hour
Figure 3-2: Warrant for Turn Treatments at Elm Street / Pearsons Road Intersection
(Source: DTMR Roads Planning and Design Manual, Chapter 13, Figure 13.23)

It is understood that as part of the previous development conditions for the site, that a commitment stands to upgrade the
Elm Street / Pearsons Road intersection to include a channelised right turn treatment at the southern approach and a
short auxiliary left turn lane from the northern approach. Please refer to Council’s Development Works Approval No.
132007.2398.02. Please also refer to Figure 3-3 showing the functional road layout plan by Calibre Consulting Drawing
15-001261-RF02.


B14158.ER02-B | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS                     COOROY RETIREMENT COMMUNITY           | 13
Log in to download the original file

RFI traffic updated 2016.pdf · 5.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.