2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2

of 151

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                          Noosa Local Disaster Recovery Plan 2015/2016

    Recovery Step                      Description                              Remarks

                                                                         This is an iterative
                     Undertake analyses of community need across
                                                                         process and the analysis
Needs Analysis       the four pillars of recovery and/or by sectors.
                                                                         will change over time as
                     Engage widely across the community to ensure
                                                                         situational awareness
                     analysis is comprehensive.
                                                                         improves

                     Finalise membership of LDRC to include
Establish            community and state agency representatives.
Recovery
                     Establish Sub-groups and Local Advisory Groups
Framework            as dictated by needs analysis.
                                                                         These steps are often
                     Document and distribute the operational plan for
Develop                                                                  undertaken concurrently.
                     the recovery.
Recovery
Operational Plan     Maintain plan throughout recovery process.

Sub-groups           Sub-groups develop Action Plans for their
Develop Action       function.
Plans
                                                                         This process may go for
                     Continue to deliver recovery services as outlined   many weeks or months
                     in the Recovery Operational Plan and as detailed    (or years in extreme
                     in Sub-group Action Plans.                          cases).
Medium Level
Recovery             Maintain and update the Recovery Operational        The LDRC must strive to
                     Plan and Sub-group Action Plans as recovery         sustain effort in
                     progresses.                                         accordance with
                                                                         priorities.
                     Progressively close:                                Must have transitional
                                                                         arrangements in place.
                        Local Advisory Groups
Transition to           Close Sub-groups                                Suitable alternate
Long Term               Close LDRC                                      process must be in place
Recovery                                                                 to support long term
                     Debrief/Review/Evaluation of the recovery effort.   recovery needs.
                     Submit final report on recovery to the LDMG         Update plans.
                     Table 2 – Main Steps in the Recovery Process

13.2 Activation
The Recovery process is activated in the same manner as disaster operations through four
levels of activation. They are:
     Alert
     Lean Forward
     Stand Up
     Stand Down

The LRC should be notified once the LDMG goes to Lean Forward, or in short/no notice
events, when the LDMG is activated to Stand Up. This is to ensure that the recovery
framework can be established based on the emerging and anticipated needs of the
community. The LDRC needs to have a representative present at the LDCC intelligence cell
(usually the LRC) when the initial damage assessment functions are undertaken during
Disaster Operations. This will assist the LDRC in developing their recovery plan. It also
ensures that disaster operations consider the needs of recovery during the response phase.
The diagram in Figure 6 depicts the activation of recovery relative to the response.



                                                                                              17
Log in to download the original file

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.