2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2

of 151

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                         Noosa Local Disaster Recovery Plan 2015/2016




                                              Figure 7 – Response and Recovery Levels of Activation
                                                              (Queensland Recovery Guidelines)

13.3 Activation process and transition between levels
The LRC activates the Recovery Group in accordance with the diagram at Figure 7 above.
The transitions between these levels are crucial periods for recovery as the recovery
activities undertaken at each level are fundamentally different.

Table 3 details the major recovery triggers, actions and communication requirements apply
to each level of activation. Note that the levels of activation are aligned with the three levels
of recovery (short, medium and long term).
 Response




                                               Triggers                      Actions                       Communications
 Alert




                                          LDMG ‘Lean             The LRC is briefed by the Local        LDC maintains
                                          Forward’ level of      Disaster Coordinator when the          communication with Local
 Response Lean Forward




                                          activation             initial damage assessment              Disaster Recovery
                                                                 functions are undertaken during        Coordinator who in turn
                                                                 Disaster Operations, This will         liaises with core members
                                                                 assist the LDRC in developing          of the LDRC.
                         Recovery Alert




                                                                 their recovery plan.                   Ad hoc reporting as
                                                                 Core members of the LDRC self-         required by the LDC
                                                                 activate and commence to gain
                                                                 situational awareness of the
                                                                 event.




                                                                                                                                18
Log in to download the original file

2015-06-23 I&S Agenda - Item 5 - Local Disaster Recovery Plan - Attachment 2(PDF, 4MB).pdf · 4.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.