Original source · versioned page text
Construction Management Plan V2
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnConstruction Management Plan 3.4 Services and finishes Prior to slabs being placed in the buildings the services are to be installed in ground as per the approved design. These works will commence within the building but will not be completed until the fitout of appliances is complete. After the structure is complete, the services will commence to be installed. These works will commence within the building but will not be completed till the façade to that level is complete. The façade provides edge protection for the men working near the edge and provides weatherproofing for equipment that is water sensitive. The works will be organised in several passes, with what we term “rough in of services” being the first pass which is all services that can be installed before the façade is completed. Finishes are normally commenced in earnest when the façade is installed to that floor. The services will be scheduled to be completed enough to allow finishes to commence in our programming. Plant, equipment and materials will be lifted to the floors via several means depending on what stage the building is at. 3.5 External works The completion of external wall cladding will allow the external works to be commenced and completed in a timely manner. The works will also include making good any areas that have been affected by the construction of the project. Once these areas are rectified, casting of external hardstands, footpaths and crossovers will commence. Landscaping works will commence concurrently in order to stabilise the ground and place soil in garden beds prior to closing area with new cast concrete slabs. All environmental controls installed as part of the earthworks, will be monitored and maintained during the construction of the warehouses. On commencement of external works according the operation works approvals, existing services like street lights, fire hydrants and the like, will be protected as required during the construction of the approved works. 3.6 Construction sequence and planning The locations and types of plant may vary depending on the results of more detailed planning as the design solidifies and the availability of plant is firmed up. There will be 3 distinct phases requiring different material handling logic, to construct the building efficiently and minimise impact on surrounding streets and neighbours. The phases are: Phase 1. Site establishment; bulk excavation, detailed excavation and footings installation Phase 2. Structure Phase 3. Finishes and external works Each phase will not happen in isolation. Phase 2 and 3 will happen simultaneously once the structure is sufficiently complete, to allow the finishes trades to commence on lower levels. Authorised Managing Director UNCONTROLLED WHEN PRINTED Page 9 of 14 Commencement Date: 27 August 2020 IMS-4-T3 Version 3 Review Date: 27 August 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.