Original source · versioned page text
Construction Management Plan V2
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnConstruction Management Plan 3.7 Material handling Material handling will be complete manually around the site, using mechanical aids as required. 3.7.1 Mobile cranes Mobile cranes will be used throughout the construction sequence and brought to site as required by the relevant contractor. 3.7.2 Concrete handling A concrete washout bay will be established on site, for cleaning purposes and dumping small leftovers. Solidified concrete waste will be regularly removed to local concrete recycling facility for processing. 3.7.3 Rubbish removal Construction waste will be removed from site by a licenced waste contractor and taken to a transfer facility for separation. Recycling bins will be used on site for materials separation and returned to suppliers for processing and recovery. 3.8 Pedestrian Traffic flow around the site Pedestrian traffic will be a focal point for the Se Luca Site Team as construction works are being carried out in and around the Project Site. There will be limited footpath access to Viewland Drive during certain times to complete crossovers, associated works and major deliveries. Chainwire fencing will be used in these areas with dust/shade cloth installed to the road frontage. The relevant statutory signage will be installed to direct the local pedestrian traffic around these areas and temporary works will be completed to maintain pedestrian access outside of working hours. 3.8.1 Workers movements All staff, subcontractors, suppliers, consultants and the like will be advised that they are to be mindful of the local residents. All parking is to be located on the site in designated subcontractor and office parking sections. 3.8.2 Material Deliveries/Waste Removal Deliveries and waste removal will be scheduled during low traffic and off peak times to limit unnecessary congestion to the neighbourhood. 3.9 Vehicular traffic flow around the site Vehicular traffic around the construction zone should not be overly affected during the construction of the new residential care facility. During these times, any necessary traffic control will be provided to limit and manage the impact on the neighbourhood. Works to these areas will be scheduled and planned in short durations to limit the affect of congestion to the area. 3.10 Traffic controllers required to coordinate traffic flow De Luca Corporation will rely on licensed traffic controllers that will be utilized when required. Not all deliveries will require traffic controllers to be onsite and will be managed accordingly by De Luca’s site staff. Site and activity specific traffic management plans will be completed when required. The aim of the traffic controllers is to ensure disruption to the local traffic is kept to minimum. Authorised Managing Director UNCONTROLLED WHEN PRINTED Page 10 of 14 Commencement Date: 27 August 2020 IMS-4-T3 Version 3 Review Date: 27 August 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.