Original source · versioned page text
Construction Management Plan V2
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnConstruction Management Plan 3.0 Construction Methodology 3.1 Demolition and excavation The bulk earthworks phase will consist of removal of the existing vegetation into a stockpile for processing onsite and then removed in chip form from site. The topsoil and organic matter will be stripped into stockpiles for removal during the works. The civil design has been completed to utilise fill material from the site to minimise the import and export of fill from the site. This will limit the truck movements required to undertake the works for this project. Existing services within the site will be located and either capped if redundant or modified if they are to be used as temporary services for the works according to the approved design. If this is unachievable than all services will be held temporarily and pumped out or supplied as required. The retaining wall systems will commence during the bulk earthworks phase and completed to allow the final level to be completed. The overall Design drawings and specifications can be provided as a standalone document (if required) and is not included in this CMP. 3.2 Substructure works From the Geotechnical report we envisage that the substructure works will be a combination of Strip and high level pad footing arrangements and some minor bored piers. As the detailed excavation is complete, foundations will be cast, in ground services installed, and the ground will be prepared for the structure and the slabs will be cast on ground. 3.3 Structure The structure trades and works will be supported by mobile cranes for lifting of materials, propriety perimeter edge protection will be used to provide fall protection. Where required perimeter scaffolding will be installed within our property to allow the external cladding trades to complete their works including painting etc. Loading and unloading of these materials and equipment will be completed outside of peak traffic times and the working hours stipulated in the Development Approval. Authorised Managing Director UNCONTROLLED WHEN PRINTED Page 8 of 14 Commencement Date: 27 August 2020 IMS-4-T3 Version 3 Review Date: 27 August 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.