Construction Management Plan V2
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnConstruction Management Plan 2.3 Site security The site is to be secured with the use of the temporary construction fences and hoardings around the perimeter of the construction site which will be established prior to the commencement of the bulk earthworks. This fencing is securely locked after hours, to prevent un-authorised access to the construction site. All visitors to the site will be required to report to the site office, and will be appropriately inducted and registered in a site attendance log book. It is proposed that the site will be accessed by vehicles via designated entry and exit points (refer Appendix 1 Site Layout Plan). Construction vehicles will be monitored and appropriately cleaned as required when leaving the site. It is anticipated the development will have approximately 10-15 movements entering/exiting the site per day, in peak construction periods with approximately 60 movements during the importation of filling material. All materials handling and unloading will be contained within the site, at designated locations. These construction handling processes will be managed on site and will not impact the surrounding or neighbouring traffic movements. 2.4 Public / Worker safety All site staff and subcontractors will be required to complete a site-specific induction before commencing work on site. The induction will cover aspects relating to safety and amenity, including access, emergency evacuation procedures, location of first aid facilities, location of amenities, site hours, material handling, noise and dust management and environmental management. Prior to commencing works on site, all subcontractors will be required to submit a project specific work health safety and environmental management plan. This plan will be reviewed by DLC for compliance with the overall project WHSE management plans. As per 2.3 above, the site is currently secured with the use of the existing temporary construction fences and hoardings around the perimeter of the construction site and is locked after hours to prevent un-authorised access to the construction site. 2.5 Hoarding and Temporary Fencing The hoarding construction will consist of temporary wire mesh fence panels to 2.1m high with branded banner mesh. Gates will be used on all access points onto the site. The branded banner mesh is also utilised to help control dust and assits by keeping the site safe from the public. Authorised Managing Director UNCONTROLLED WHEN PRINTED Page 7 of 14 Commencement Date: 27 August 2020 IMS-4-T3 Version 3 Review Date: 27 August 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.