NOOSA COUNCIL IDAS Development Application Decision Notice                                                   9 of 17


28.     Sediment and erosion control measures must be in place prior to works commencing. If such measures
        are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
        sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
        natural waterways. Although the sediment and erosion control measures have been approved Council’s
        Manager – Land Development may request further controls to be installed should approved measures be
        inefficient.

29.     Certification of the completed works must be provided by the supervising engineer, together with
        certification from the Hydraulic Engineer that the completed works conform with all aspects of the
        stormwater design and the designed environmental outcomes for the development.

30.     Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement of
        satisfactory “As Constructed” records shall be submitted to Council.

        As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer (RPEQ) for
        design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all
        services and structures. All of which shall be submitted to Council for checking and for Council’s records.
        The data must fully detail levels for all engineering works including but not limited to drainage structures,
        finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
        As Constructed (ADAC) digital format.            (Guidelines on the use of ADAC are available at
        www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering Design Standards – Roads,
        Drainage and Earthworks.
        Approval of works shall not be granted until all As Constructed information has been supplied and
        accepted by Council.

31.     A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed
        on construction works during the maintenance period, which is a minimum period of 12 months duration.
        Such bond must be lodged by, and shall only be accepted from the Developer for the works.

32.     The works to become Council assets will not be accepted "On Maintenance" until the landscaping is
        completed.

33.     These works are also to be in compliance with the relevant conditions of Development Permit No.
        2006/1594.

34.     Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the Relevant Period is two (2) years
        from the day this permit takes effect during which time all conditions must have been complied with and
        the Plan of Survey lodged with the Council for endorsement.

35.     Notwithstanding that Council has checked the plans with due care, where it is found during construction
        that variations from Council's standards exist, then Council standards shall apply

Land Use

36.     Development undertaken in accordance with this approval must comply with the approved management
        plans for the site.

Open Space and Environmental Covenant Areas

Lot 1

37.     Existing trees on the site located within the OS3 and OS6 environmental covenant areas and within the
        Eenie Creek Road reserve are to be retained and protected from construction damage, except where
        required to be removed due to the requirements of the approved ecological restoration plan; and where
        any work in the vicinity of the service access through OS3 shall minimise any disturbance to the existing
        vegetation in this area.

38.     The OS3 covenant area southern boundary and the full boundary perimeter of the OS6 covenant area are
        to be fenced with star picket and wire as temporary fencing prior to any construction work commencing on
        the site, and maintained for the duration of the construction process. No access into this area is permitted
        except for ecological restoration purposes.

Lot 3




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@a000e63d\@[email protected]

Used in these records

About this file

File size
58 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001242.001 [As Published].pdf · 58 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.