2015-03-31 I&S Committee - Item 5 - Attachment 1 - Munna Pt Bridge Repairs Level 3 Bridge Report
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Photo W – Pier 5, Core B taken in top of pilecap, near Photo X – Pier 5, Core A taken in top of pilecap, near
middle. ASR crack extends from surface to reo level middle. 2 x ligatures in fair condition with surface
rusting. 103mm cover.
Photo Y – Pier 1, Pile 3 – Temporary hole opened in Photo Z – Pier 1, Pile 8 – Temporary hole opened in
side of pile. ASR crack extends from surface to reo side of pile. ASR crack extends from surface to reo
level. High strength steel strand (tensioned) in good level. High strength steel strand and wire spiral cage in
condition. Wire spiral cage in good condition. 67mm good condition. Reinforcement headbar in fair to good
cover to high strength steel strand. 60mm cover to wire condition. 68mm cover to high strength steel strand.
spiral cage. 61mm cover to wire spiral cage.
3.0 Condition Assessment
Tod Consulting’s bridge condition assessment (2014) can be quickly understood by
looking at drawing 02600-SK1 in Appendix F. We infer the following conclusions from the
previous testing, inspections and our own testing in 2014:
o Deck units
• 4 deck units per span are suffering from ASR, and the prestressing strands and
reinforcement in these may have corroded. It is conservative to assume these
deck units are now structurally ineffective.
• The rest of the deck units are likely to have prestressing strands and
reinforcement that are 100% intact.
Page 21 of 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.