2015-03-31 I&S Committee - Item 5 - Attachment 1 - Munna Pt Bridge Repairs Level 3 Bridge Report

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Photo W – Pier 5, Core B taken in top of pilecap, near    Photo X – Pier 5, Core A taken in top of pilecap, near
middle. ASR crack extends from surface to reo level       middle. 2 x ligatures in fair condition with surface
                                                          rusting. 103mm cover.




Photo Y – Pier 1, Pile 3 – Temporary hole opened in       Photo Z – Pier 1, Pile 8 – Temporary hole opened in
side of pile. ASR crack extends from surface to reo       side of pile. ASR crack extends from surface to reo
level. High strength steel strand (tensioned) in good     level. High strength steel strand and wire spiral cage in
condition. Wire spiral cage in good condition. 67mm       good condition. Reinforcement headbar in fair to good
cover to high strength steel strand. 60mm cover to wire   condition. 68mm cover to high strength steel strand.
spiral cage.                                              61mm cover to wire spiral cage.




3.0 Condition Assessment

Tod Consulting’s bridge condition assessment (2014) can be quickly understood by
looking at drawing 02600-SK1 in Appendix F. We infer the following conclusions from the
previous testing, inspections and our own testing in 2014:

o   Deck units
    • 4 deck units per span are suffering from ASR, and the prestressing strands and
       reinforcement in these may have corroded. It is conservative to assume these
       deck units are now structurally ineffective.
    • The rest of the deck units are likely to have prestressing strands and
       reinforcement that are 100% intact.




                                                 Page 21 of 31
Log in to download the original file

2015-03-31 I&S Committee - Item 5 - Attachment 1 - Munna Pt Bridge Repairs Level 3 Bridge Report(PDF, 7MB).pdf · 7.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.