Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2016-10-17 General Committee Meeting Notes

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   17 OCTOBER 2016




                                      Page 26 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                     17 OCTOBER 2016

              (i)      The fungal decay to the wall stop to the north eastern corner of the area outside of the male
                       toilets, as well as to the eastern end of some of the chamfer boards in this area.
              (ii)     The first vent pipe in from the eastern end of the northern side of the building is exhibiting
                       the effects of water penetration (fungal decay) in the area where the vent pipe passes
                       through the soffit sheeting.
              (iii)    The sets of louvres to the eastern side of the female toilet section of the building are in need
                       of replacing.

                       The painted finish to the western gable to the northern end of the building is at a stage
                       where it requires reinstating, as does the painted finish to the return to the western end of
                       this northern external wall.

                       These boards can be marked at the time the scope of works is being produced.

               (b)     Southern side.
              (i)      The lower four runs of chamfer boards to the southern end of the building, are to be
                       removed and replaced with new chamfer boards. The damaged sections of the chamfer
                       boards, are to be discarded and the sound sections of the chamfer boards, are to be used to
                       reinstate other damaged chamfer boards of the same mill, in other areas of the external
                       walls, where there is evidence of termite damage or damage due to the effects of fungal
                       decay.
                       These areas include but are not limited to the following areas:

                       The upper sections of the southern wall, the return to the western external wall and to the
                       eastern end of the southern external wall, near the broken downpipe.   These and other
                       areas are to be marked on site at the time the Scope of Works is being produced.
              (ii)     The Mini Orb cladding to the window awning to the southern end of the building, in the area
                       outside of the eastern stage room is corroding and is due for replacing.

               Eastern side. (Nearest the Railway line.)

               (I)     The lower section of the eastern gable to the northern end of the building, in the area above
                       the skillion roof above the disabled toilet/bar area is exhibiting the effects of fungal decay
                       and termite damage.

                       There is evidence of the effects of fungal decay to the chamfer boards below the western
                       end of the bottom rail to the northern and southern sides of the external stairs to the
                       eastern side of the building as well as to the area to the bottom of the external wall, in the
                       area below the two aluminium framed windows to the eastern end of the raised dining
                       room area but not limited to these areas.
                       The areas that require parts of the chamfer boards to be replaced due to the effects of
                       fungal decay can only be accurately ascertained by further invasive investigation and the
                       areas marked to identify same. The full extent will dictate the number of chamfer boards to
                       be removed from the lower section of the southern wall of the building.

                                                                                                              2

                                                                                                            Page 26 of 67
Log in to download the original file

2016-10-17 General Committee Meeting Notes(PDF, 11MB).pdf · 11.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.