The western end of the third horizontal batten in from the southern end of the external wall
of the kitchen area and which is on the fourth span back from the eastern end of this end of
the building is loose and hanging out of position. This will require refixing as part of
normal maintenance.
(ii) Sheeted in section under the raised dining section:
(a) The section of the sub-floor under the eastern side of the raised dining area was locked at
the time of inspection.
It is noted that the bottom of the corrugated iron walls to the enclosed area, are in direct
ground contact and as such, will require an appropriate termite management system to be
installed.
Note: The base of the corrugated iron walls are to have a chemical termite management
system applied so as to ensure that both sides of the corrugated iron wall are adequately
protected against unobserved termite access from ground level.
The termiticide to be used would be either Termidor® or Altriset®, both are non- repellent
termiticides and should be applied in accordance with the APVMA approved label.
(b) The timber off cuts on the ground under the building, are in need of removing as part of any
competent termite management program.
It is noted that there is evidence of termites having eaten various areas of these off cuts.
No active termites were observed at the time of inspection.
(iii) Stumps under the building:
(a) The concrete and concrete masonry stumps under the hall, have in most instances been
packed with pieces of fibre cement sheeting.
It is reasonable to assume that the fibre cement sheeting to the various areas around the
sub-floor area and in the building in general, has been manufactured using asbestos and as
such, should be treated accordingly.
It is further noted that there is a significant amount of asbestos cement sheet pieces on the
ground near the base of the stumps, but not limited to these areas of the sub-floor.
(b) There are some stumps to the southern section of the sub-floor area, that are leaning to the
west.
The fifth stump in from the southern end of the building and which is located under the third
bearer in from the western side of the building, has a significant lean and is in need of
reinstating.
To ascertain the exact cause of the movement of these stumps would require further
invasive investigation to be carried out.
(c) The sixth stump back from the southern end and which is located under the third bearer
back from the western side of the building, has a gap of approximately 16 mm between the
top of the stump cap and the underside of the bearer and as such the bearer isn’t supported
on this stump.
The sixth stump back from the southern end and which is located under the fourth bearer
6
Page 30 of 67See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.