2016-10-17 General Committee Meeting Notes

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   17 OCTOBER 2016




                                      Page 31 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                    17 OCTOBER 2016

                       back from the western side of the building has a gap of approximately 19 mm between the
                       top of the stump cap and the underside of the bearer and as such, the bearer isn’t
                       supported on this stump.
                       It is further noted that there are some stumps in this area that are leaning towards the west
                       at the top of the various stumps.

               (d)     The tie-down (anchor bolts) to the building to the stumps in general is generally non existent
                       except for a couple of tie-down anchor bolts to the southern end of the sub-floor area.
                       The tie-down for the building in general is in need of reassessing and where required
                       additional, appropriate tie-down (Anchor bolts) to be installed.

               (e)     The stump caps and ant capping to the various areas, should not be relied on as part of a
                       competent termite management system in their present form.

                       It is noted that there is evidence of rust and corrosion as well as distortion of various stump
                       caps to the various stumps to the building, especially but not limited to the eastern side of
                       the building.
               (f)     The drainage under the southern end of the building, especially under the stage and kitchen
                       area, but not limited to this area is in need of addressing so that water cannot continue to
                       be directed under this section of the building.
                       The water from the incomplete/broken downpipe outside of the south eastern corner of the
                       original building /stage area is also directing a significant amount of water under the
                       building.

                       Part of the rectification work for this downpipe will be to check the stormwater pipe located
                       at the base of this downpipe, for blockages.

               (iv)    Bearers & Sub-floor etc:
               (a)     The northern end of the fourth bearer in from the eastern side of the building and which is
                       located over the fourth stump in from the northern end of the building, isn’t adequately
                       bearing on the stump.

               (b)     The bearer to the southern end of the building and which is located to the rear of the stage
                       area is exhibiting the effects of significant termite damage.
                       This bearer will require the debris to be vacuumed out and treating with an appropriate
                       timber preservative (Copper naphthenate or Disodium Octoborate Tetrahydrate (Protect
                       Timber) and an additional bearer to be added to the northern face of the bearer, whilst
                       leaving the original bearer in place.
                       The installation of this supplementary bearer can be carried out at the time the four or more
                       lower chamfer boards to the southern end of the original section of the building are
                       replaced.

                                                                                                             7

                                                                                                           Page 31 of 67
Log in to download the original file

2016-10-17 General Committee Meeting Notes(PDF, 11MB).pdf · 11.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.