Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2016-10-17 General Committee Meeting Notes

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   17 OCTOBER 2016




                                      Page 32 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                    17 OCTOBER 2016

                       See 3.002 THE EXTERIOR OF THE BUILDING.
                       Further information in relation to the carrying out of the installation of the supplementary
                       bearer and the necessary protection of the existing bearer can be provided if required.

                       The tenon to the bottom of the external studs to the southern end of the original building,
                       have been eaten by termites and as such, the bottom of the studs are to be securely fixed to
                       the supplementary bearer.
                       Further details can be provided if required.

                       The bottom of the 75x16 RHW. diagonal timber braces to the southern external wall, are in
                       need of terminating property due to the existing termination being negated by termite
                       damage to the ends of the 75x16 RHW braces.

                       Note: The braces will be able to be addressed easily whilst the lower chamfer boards are off
                       the wall.

               (c)     The bearers (125x100 RHW) to the south western corner of the building are in need of
                       rectification work to be carried out, due to the bottom section of the southern end of the
                       western bearer, being significantly compromised by the effects of termite damage.
                       The bottom of the 100x100 corner stud to this area is also in need of minor modification to
                       be carried out at this time due to the effects of termite damage. Further information in
                       relation to the carrying out of the rectification work to this area of the existing bearers and
                       corner stud can be provided if required.
                       The bottom of the 100x100 wall stud that is located over the second bearer back in from the
                       western end of the southern external wall is in need of minor modification to overcome the
                       effects of termite damage.
                       Note:  The finished height of the soil under the bearers to the south western corner of the
                       building, should be lowered and maintained so that there is aminimum of 100mm
                       clearance at all times.

               (d)     It is strongly recommended that the soil under the bearers in this area and the ground, out
                       to 150 mm each side of the bearers is treated with Termidor or better, in order to minimise
                       the risk of termite infestation.
                       See notes on the retaining timber across the base of the western side of the building.
               (e)     The wall plates that have been fitted to the eastern and western ends of the stage floor
                       framing and on which the floor joists are supported, have been nailed in position.
                       | would strongly recommend that the wall plates in this area under the floor joists have
                       additional hot dipped galvanised (HDG), Type 17 screws installed to each stud onto which it
                       is fixed.

               (f)     The western end of the southern bearer below the kitchen, has settled downwards by
                       approximately 30 mm., due to the effects of termite and fungal decay. This bearer will
                       require jacking back into position and the appropriate steel brackets to be fitted under the
                       bearer and to the internal face of the bearer.

                                                                                                             8

                                                                                                           Page 32 of 67
Log in to download the original file

2016-10-17 General Committee Meeting Notes(PDF, 11MB).pdf · 11.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.