2016-10-17 General Committee Meeting Notes

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   17 OCTOBER 2016




                                      Page 33 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                     17 OCTOBER 2016

               (g)     The section of the bearer that is located approximately 300 mm back from the western end
                       of the second bearer back from the southern side below the kitchen is exhibiting a fracture
                       in the bearer.

                       This fracture appears to be due to a natural fault in the timber bearer and would in my
                       opinion, have been present for a very long time.
                       This defect can be addressed by jacking up the dropped area of the bearer and plating with
                       either with a steel cheek plate bolted to the side of the bearer or an additional seasoned
                       timber bearer, being bolted to the existing bearer.

               (h)     The bearers to the south eastern corner below the kitchen, are exhibiting damage due to the
                       action of timber pests (termites and fungal decay). This section will require the appropriate
                       steel brackets to be fitted as well as the bottom of the corner stud being reduced and
                       secured to an additional piece of timber that is to be installed on top of the bearers in this
                       area.
                       It is further noted that the bottom of the wall stud in this area is also in need of modification
                       due to the effects of timber pests.
                       The exact method of rectification will depend on further invasive investigation of the bearers
                       and corner stud in this area.

              (i)      There is evidence of the effects of fungal decay to the third bearer in from the southern end
                       of the eastern side of the kitchen. This is in the area near the northern edge of the landing
                       that runs off to the eastern side of the kitchen.

                       This area can be rectified by installing a steel plate against the western face of the eastern
                       bearer.

               (v)     Termite Management System etc.:

               (a)     The termite management system under the building is in need of maintenance.

                       To ascertain the full extent of the additional work required, will require access to the
                       Certificate of Treatment and associated paperwork that has been provided to the RSL. At the
                       time they had the termites treated.

               (b)     The piece of timber that is located to the western end of the southern face of the concreted
                       area that forms the floor to the entry / foyer area is in ground contact and in contact with
                       the timber frame of the floor to this area.
                       This should be removed or modified as part of a competent termite management system.

               3.004   EXTERNAL ROOF AREA & ACCESSORIES.

              (i)      ROOF, GUTTERING & RAINWATER DOWNPIPES:
               (a)     The galvanised corrugated iron roof over the awning to the east of the entry/foyer area is
                       exhibiting the effects of rust and minor corrosion.
                       The fixing of the various roof sheets to this awning is at a stage where a reasonable wind
                       event from the right direction, either to the east or the west could strip the sheeting from
                       the roof frame.

                                                                                                               9

                                                                                                            Page 33 of 67
Log in to download the original file

2016-10-17 General Committee Meeting Notes(PDF, 11MB).pdf · 11.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.