2016-10-17 General Committee Meeting Notes

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   17 OCTOBER 2016




                                      Page 34 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                    17 OCTOBER 2016

                       The metal awning stays are exhibiting the effects of rust and corrosion and as such, should
                       be reassessed at the time the scope of works is being produced or when the roof to the
                       awning is replaced or refixed.
                       It would be prudent to verify the connections of the awning stays, as well as the awning
                       frame at the time the roof is removed or repaired.
                       The corrugated galvanised iron roof over the awning to the east of the entry/foyer area is a
                       pre 1966 profile (double under/double over) and not the modern custom orb profile
                       (under/over). This will give you a good indication of the age of the roof.
               (b)     The skillion roof over the eastern sitting area, bar and the male toilets is exhibiting the
                       effects of rust and corrosion.
                       It is noted that there are holes in the lower section of the roof, in the area down stream
                       from the rainwater downpipe to the north eastern corner of the raised dining area.
                       The water damage to the eaves soffit and fascia’s in this area, can easily be seen from
                       ground level. The soffit sheeting is sitting down away from the frame on the southern end of
                       this eaves soffit area to the southern end of the skillion roof over the sitting area
                       The cause of the holes in the roof above the fascia/eaves soffit is due to the fact that the
                       water from the colour bond sheet roof that has been fitted to the original hall, has provided
                       an inert catchment area that is depositing the roof water from the upper gable roof onto the
                       lower zinc coated skillion roof over the sitting area, thus causing corrosion.

                       The downpipe in this area as well as the area above the south western corner of the kitchen,
                       haven’t had an appropriate spreaders installed.
                       This should be addressed at the time the rainwater gutters are replaced and the lower
                       skillion roof over the sitting area and the kitchen are replaced or repaired.

                       Note 1: The rainwater gutter to the eastern side of the roof over the southern section of the
                       stage area, has failed due to the effects of an inert catchment directing rainwater into the
                       zinc rainwater gutter that is located above the western end of the kitchen roof.

               Note 2: The rainwater gutters to the building, are generally zinc coated and as such the inert
                       catchment caused by the fitting of the colour bonded roof sheeting, has caused the
                       premature degradation of the rainwater gutters.

               Note 3: The rainwater gutters, should be replaced with Colorbond rainwater guttering, so as to be
                       compatible with the colour bonded roofing that has been fitted. The existing Zinc coated
                       guttering is breaking down prematurely due to the effects of the inert catchment caused by
                       the colour bond roof sheeting or run off from the colour bond roof sheeting.
               (c)     The top two saddles (astragals) to the rainwater downpipe to the northern end of the
                       eastern external wall are not secured on one leg. This will require addressing as part of
                       normal maintenance.
                       The rainwater downpipes, can be replaced where required at the time the roof is replaced in
                       this area above the sitting area to the eastern side of the building.

                                                                                                            10

                                                                                                           Page 34 of 67
Log in to download the original file

2016-10-17 General Committee Meeting Notes(PDF, 11MB).pdf · 11.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.