Original source · versioned page text
2016-10-17 General Committee Meeting Notes
The original of this document is very large (11.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 17 OCTOBER 2016
Page 37 of 67
GENERAL COMMITTEE MEETING AGENDA 17 OCTOBER 2016
(c) The VJ wall up the eastern side of the door opening that leads out to the main hall
immediately to the south of the entry door to the disabled toilet area is exhibiting the
effects of termite damage.
It is also noted that the door to this opening has been removed. Thus eliminating the air lock
for this area.
(v). MALE TOILETS:
(a) The two louvre units to the eastern side of the male toilet section of the building are in need
of replacing due to rust and corrosion and two louvre blades missing. The louvre units to
the northern side of the male toilet area are also in need of replacing. This is part of general
building maintenance.
(b) There are approximately seven floor tiles missing from the floor area of the male toilet area.
There are approximately four of the loose tiles sitting on the end of the floor and these can
be refixed along with some other tiles suitable for this floor.
Further information can be provided if required.
(c) The hinges to the doors in the male toilet area are in need of upgrading so that the doors are
adequately secured/supported.
(d) There is evidence of termite damage to the door jamb and architrave to the door opening to
the urinal area as well as to the VJ lining.
There is termite damage to the VJ wall to the first toilet cubicle area. There is other termite
damage to this area.
To ascertain if there is any significant damage to the wall frames in this area would require
further invasive investigation to be carried out.
(vi). | BAR AREA:
(a) The door to the bar area has a small hole in the southern face of the door and this door is
also starting to delaminate at the bottom.
(vii). | MAIN HALL:
(a) There wall sheeting to the western wall, in the area above the window to the north of the
western (disabled) entry and the window to the southern side of the western (disabled)
entry, are exhibiting the effects of transverse tears to each of these asbestos cement sheets
(fibrolite or similar) above these windows.
(b) The entrance set to the western side of the hall is in need of rectification to ensure that the
hall can be securely locked when required.
It is further noted that the door can be easily opened from the outside, when it is locked and
as such will require making secure.
13
Page 37 of 67See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.