2016-10-17 General Committee Meeting Notes

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   17 OCTOBER 2016




                                      Page 40 of 67

GENERAL COMMITTEE MEETING AGENDA                                                                     17 OCTOBER 2016

               (c)     The hipped section to the south western corner of the main roof to the building and which
                       is located above the storage loft and room to the western side of the stage, including the
                       area to the east of the western gable to the southern end of the western side of the building
                       is exhibiting significant termite damage to the various rafters in this area.
                       The damage appears to be confined to the hip rafter that runs up to the western edge of the
                       southern dutch gable, some cripple rafters as well a small common rafter to the south of the
                       minor ridge board and the gable rafters to the western gable and ridge board.
                       This area is able to be seen from the loft to the south western corner of the building and the
                       room to the north of the loft which is to the west of the stage area.
                       The termite damage is able to be rectified and is only a small part of the roof system as a
                       whole.

                       IT IS CRITICAL THAT NO ONE WALKS ON THE ROOF ABOVE THIS AREA, AS THEY WILL
                       COLLAPSE PART OF THIS SECTION OF THE ROOF.

               (d)     The main section of the roof over the main hall is not exhibiting any significant termite
                       damage in the King Post Trusses that were visible from inside of the roof space over the
                       main hall.

                       To ascertain if there is any additional termite damage to the lower western side of the tails
                       of these trusses especially to the western side of the roof should be checked further by
                       lifting some of the roof sheets over these areas.

               (e)     The king posts to the majority of the King Post Trusses to the main roof are in need of the
                       bottom of the king posts to be bolted to the bottom chord of the trusses, as the bottom
                       chords have settled approximately 50 mm lower that it was when first constructed.

                       Note: This can be achieved a number of ways, including but not limited to bolting a steel
                       plate to the side of the lower section of the king post and then bolting it to the side of the
                       bottom chord, ensuring that there is sufficient timber around the bolts to prevent the bolts
                       from tearing out of the king post as they have done at this time.
               (f)     The bolts that currently exist at the bottom of the king post/bottom chord connection didn’t
                       have sufficient timber between the bottom of the king post and the bolt that was to secure
                       the king post to the bottom chord.

                       The vertical hanger bolts for the five steel tie bolts across the hall and which support the tie-
                       bolts, are in need of the timber bridging at the head of the hanger bolts to be reassessed
                       and upgraded where required.

               (g)     The second ceiling sheet (Caneite) back in from the western side of the ceiling over the stage
                       area, has sagged approximately 125 mm in the middle of the sheet and is in danger of
                       falling. There is some cover strip missing fro the eastern edge of this sheet.
                       This sheet can be seen from the underside of the ceiling over the stage. The eastern edge of
                       the sheet has also come down away from the ceiling frame. This ceiling sheet will require
                       refixing in place.
                       There are other ceiling sheets over the stage, that have lesser sags present and these will
                       require additional fixings to be installed.

                                                                                                             16

                                                                                                            Page 40 of 67
Log in to download the original file

2016-10-17 General Committee Meeting Notes(PDF, 11MB).pdf · 11.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.