Skip to the record
Accept no imitations.

Original source · versioned page text

2022-09-06 Planning & Environment Meeting Agenda

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                           6 SEPTEMBER 2022


               and clearly shown on plans submitted for operational works.
          d.   Any relocation/reinstatement of existing services in the road verge.
          These works are to be undertaken at no cost to Council.
          Site Access and Driveways
    19.   A sealed access driveway must be provided from Wimmers Lane to all parking and
          manoeuvring areas of the development. The works must be undertaken in accordance
          with an Operational Works approval and must include in particular:
          a.   a driveway crossover generally in accordance with RS-051 and any associated
               addendum.
          Car Parking
    20.   A minimum of 23 car parking spaces and 2 motor cycle spaces must be provided and
          marked on the site for the commercial development, and made available and
          accessible at all times while the use is open for business. The works must be
          undertaken in accordance with an Operational Works approval and must include in
          particular:
          a.   pedestrian routes in accordance with the conditions of this Decision Notice .
          b.   1 disabled parking space within the total.
          c.   dimensions, crossfalls and gradients in accordance with Australian Standard
               AS2890: Parking Facilities.
    21.   All car parking areas and access driveways must be maintained exclusively for vehicle
          parking and manoeuvring and kept in a tidy and safe condition at all times.
          Pedestrian and Bicycle Facilities
    22.   Pedestrian and bicycle facilities must be provided for the development. The works
          must be undertaken in accordance with an Operational Works approval and must
          include in particular:
          a.   a 2 metre wide footpath along one side of Wimmers Lane and Emerald Street.
          b.   the resealing of the existing asphalt path fronting the development.
    23.   Pedestrian and bicycle facilities must be provided for the development and include:
          a.   10 bicycle parking spaces and 5 lockers; and
          b.   one shower cubicle with ancillary change room.
          Stormwater Drainage
    24.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval and the Queensland Urban Drainage Manual, and must include in
          particular:
          a.   works generally in accordance with the Stormwater Layout Plan. Fig 1.2 Revision
               B prepared by Callaghan & Toth dated 6 July 2022;
          b.   extension of the site stormwater system to accommodate stormwater from the
               existing external drainage pipe from Lot 2 on RP44101 to the east; and
          c.   the use of gravity stormwater drainage and not surcharge pits.
          This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
          infrastructure.




                                                                                      Page 7 of 63
Log in to download the original file

2022-09-06 Planning & Environment Meeting Agenda(PDF, 9MB).pdf · 9.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.