Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2018-03-12 GC Agenda - Attachment 1 to Item 5 - Noosa Aquatic Centre Asset Management Plan

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                      Noosa Council
                                                                              Asset Management Plan
                                                                                Noosa Aquatic Centre
Technical Levels of service
Performance        Level of Service       Measure           Measurement           Target
Measure                                                     Criteria
Reliability        The ability of the     Mean Time         Corrective Work       Greater than 95%
                   NAC to consistently    between failure   Orders                reliability
                   perform its intended   (MTBF)
                   function on demand
                   and without
                   degradation or
                   failure.
Maintainability    The probability that   Mean Time to      Labour hours in       Less than 10 hours
                   a given                Repair (MTTR)     planned and
                                                                                  to respond to any
                   maintenance action,                      corrective work
                                                                                  high priority
                   for an item under                        orders
                                                                                  reactive work.
                   given conditions of
                   use can be carried
                   out within a stated
                   time interval
Quality            The NAC Facility       Asset condition   Number of 1 –         That defects are
                   Assets are             rating            asset condition       prioritised and
                   maintained within                                              rectified for assets
                   the 1-3 asset                                                  to be maintained at
                   condition criteria.                                            a minimum
                                                                                  standard of
                                                                                  condition 3.




                                                                                             Page 25
Log in to download the original file

2018-03-12 GC Agenda - Attachment 1 to Item 5 - Noosa Aquatic Centre Asset Management Plan(PDF, 2MB).pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.